Fla. Admin. Code Ann. R. 25-18.020 - Pole Safety, Inspection, Maintenance, and Vegetation Management
(1) This rule applies to all communications
services providers as defined in Section
366.02(3),
F.S., that own poles as defined in Section
366.02(5), F.S.
This rule does not apply to poles used solely to support wireless
communications service facilities or poles with no public utility electrical
overhead facilities attached. For the purposes of this rule, "overhead
facilities" are defined as fixtures, conductors, wires, cables, and other
devices owned by public utilities that are attached to poles owned by a
communications services provider.
(2) Safety, Inspection, and Maintenance
Standards. Each communications services provider must exercise due care to
reduce hazards to which its employees, customers, and the public may be
subjected by reason of its poles. Accordingly, all poles of communications
services providers subject to the Commission's jurisdiction under Section
366.04(9),
F.S., must be constructed, installed, maintained, relocated, and inspected in
accordance with the National Electrical Safety Code (NESC), which is
incorporated by reference in Rule
25-6.0345, F.A.C.
(3) Inspection, Repair, and Replacement of
Poles. Each communications services provider must conduct inspections of its
poles at least every eight (8) years to ensure adherence to the strength and
clearance standards of the NESC. Inspections must include visual checks to
determine compliance with the strength and clearance standards of the NESC.
Poles not in compliance with NESC standards must be repaired or replaced to
meet those standards.
(4)
Vegetation Management of Poles. Each communications services provider must
ensure that the vegetation management of its poles meets the standards set
forth in Part 2 of the NESC.
(5)
Emergency Response and Storm Restoration Procedures and Protocols. Within six
months of the effective date of this rule, each communications services
provider must provide a copy of its emergency response and storm restoration
procedures and protocols to the Division of Engineering.
(a) The procedures and protocols must include
the following:
1. A description of the
communications services provider's procedures and protocols for communicating
with federal, state, and local emergency operations officials;
2. A description of how the public can
contact the communication services provider to report issues with its poles,
such as broken poles, downed overhead facilities, or obstructive vegetation;
and
3. A description of the
communication services provider's procedures to repair and replace damaged
poles and overhead facilities, including protocols for coordinating with public
utilities, through emergency response and storm restoration
efforts.
(b) If the
communication services provider makes changes to its emergency response and
storm restoration procedures and protocols, the communication services provider
must file the updated emergency response and storm restoration procedures and
protocols with the Division of Engineering within 30 days of the
change.
(c) Every three calendar
years after the initial submission, each communication services provider must
notify the Division of Engineering in writing that it has reviewed its
emergency response and storm restoration procedures and
protocols.
(6) Reporting
Requirements. By June 1 of each year, each communications services provider
must file with the Commission Clerk an Annual Report.
(a) The Annual Report must include the
following information for the prior calendar year:
1. The number of poles owned in whole or in
part by the communications services provider at the beginning and at the end of
the calendar year;
2. The number of
poles that were scheduled for inspection;
3. The number of poles actually
inspected;
4. The number of poles
that failed inspection;
5. The
number of poles strength tested and the methods used to ensure compliance with
the NESC strength requirements;
6.
The number of poles that failed strength testing;
7. The number of poles repaired and a summary
of the repairs;
8. The number of
poles replaced and reason for replacement; and
9. The total miles of vegetation management
conducted.
(b) The Annual
Report must include the following information for the upcoming calendar year:
1. The number of poles to be inspected;
and
2. The total miles for which
vegetation management will be conducted.
(7) Penalties. A willful violation or refusal
to comply with this rule will result in monetary penalties as follows:
(a) $500 for the first violation;
(b) $1, 000 for the second
violation;
(c) $1, 500 for the
third violation;
(d) $2, 000 for
the fourth violation; and
(e) $5,
000 for the fifth and any subsequent violation.
Notes
Rulemaking Authority 350.127(2), 366.04(9)(b) FS. Law Implemented 366.04(9), 366.095 FS.
New 5-1-22.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.