Fla. Admin. Code Ann. R. 25-6.0343 - Municipal Electric Utility and Rural Electric Cooperative Reporting Requirements
(1) Application
and Scope. The purpose of this rule is to define certain reporting requirements
by municipal electric utilities and rural electric cooperatives providing
distribution service to end-use customers in Florida.
(2) The reports required by subsections (3)
of this rule shall be filed with the Commission Clerk by March 1, 2021, and
every three years thereafter for the three preceding calendar years. The
reports required by subsections (4) and (5) of this rule shall be filed with
the Commission Clerk by March 1 of each year for the preceding calendar
year.
(3) Standards of
Construction. Each municipal electric utility and rural electric cooperative
shall report the extent to which its construction standards, policies,
practices, and procedures are designed to address the ability of transmission
and distribution facilities to mitigate damage caused by extreme weather. Each
utility report shall, at a minimum, address the extent to which its
construction standards, policies, guidelines, practices, and procedures:
(a) Comply, at a minimum, with the procedures
set forth in Rule 25-6.0345, F.A.C.
(b) Are guided by the extreme wind loading
standards specified by the procedures set forth in Rule
25-6.0345, F.A.C., for:
1. New construction;
2. Major planned work, including expansion,
rebuild, or relocation of existing facilities, assigned on or after the
effective date of this rule; and
3.
Targeted critical infrastructure facilities and major thoroughfares taking into
account political and geographical boundaries and other applicable operational
considerations.
(c)
Address the effects of flooding and storm surges on underground distribution
facilities and supporting overhead facilities.
(d) Provide for placement of new and
replacement distribution facilities so as to facilitate safe and efficient
access for installation and maintenance.
(e) Include written safety, pole reliability,
pole loading capacity, and engineering standards and procedures for attachments
by others to the utility's electric transmission and distribution
poles.
(4) Facility
Inspections. Each municipal electric utility and rural electric cooperative
shall report, at a minimum, the following information pertaining to its
transmission and distribution facilities:
(a)
A description of the utility's policies, guidelines, practices, and procedures
for inspecting transmission and distribution lines, poles, and structures
including, but not limited to, pole inspection cycles and pole selection
process.
(b) The number and
percentage of transmission and distribution inspections planned and
completed.
(c) The number and
percentage of transmission poles and structures and distribution poles failing
inspection and the reason for the failure.
(d) The number and percentage of transmission
poles and structures and distribution poles, by pole type and class of
structure, replaced or for which remediation was taken after inspection,
including a description of the remediation taken.
(5) Vegetation Management. Each municipal
electric utility and rural electric cooperative shall report, at a minimum, the
following information pertaining to the utility's vegetation management
efforts:
(a) A description of the utility's
policies, guidelines, practices, and procedures for vegetation management,
including programs addressing appropriate planting, landscaping, and problem
tree removal practices for vegetation management outside of road right-of-ways
or easements, and an explanation as to why the utility believes its vegetation
management practices are sufficient.
(b) The quantity, level, and scope of
vegetation management planned and completed for transmission and distribution
facilities.
Notes
Rulemaking Authority 350.127(2), 366.05(1) FS. Law Implemented 366.04(2)(f), (6) FS.
New 12-10-06, Amended 12-10-20.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.