Fla. Admin. Code Ann. R. 40A-3.531 - Abandoned Well Plugging
(1) All abandoned
wells shall be plugged.
(2) It
shall be the responsibility of:
(a) The water
well contractor to plug any well drilled under his license which is not
completed or is not suitable for its intended use when work is completed. Wells
which are not completed by the contractor shall be plugged prior to the well
drilling rig being removed from the site. A well which is determined to be
unsuitable for its intended use shall be plugged within fourteen (14) days of
notification from the District.
(b)
The property owner to have properly plugged any existing abandoned well on his
property, or any well on his property which, following construction, attains
the state of an abandoned well as defined in subsection
40A-3.021(1),
F.A.C., of these rules.
(3) Any well which was not constructed in
accordance with the standards of Part II of these rules and fails to be
corrected within a time certain may be deemed an abandoned well.
(4) Abandoned wells and wells shall be
plugged by filling them from bottom to top with grout, unless otherwise
provided in writing by the District. The use of alternative methods or
materials shall not cause degradation of the water resource.
(5) Abandoned wells shall be plugged only by
a licensed water well contractor.
Notes
Rulemaking Authority 373.044, 373.113, 373.171, 373.309, 373.337 FS. Law Implemented 373.206, 373.207, 373.209, 373.306, 373.308, 373.309 FS.
New 1-9-86, Formerly 40A-3.701(5), Amended 4-5-88, 8-1-89.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.