Fla. Admin. Code Ann. R. 40E-41.163 - Conditions for Issuance of Surface Water Management Permits in the Kissimmee River Basin
(1) Allowable
discharge for projects within the Kissimmee River Basin shall be based upon the
post-development discharge rate not exceeding the pre-project development
discharge rate during a design storm of a 10 year, 3 day duration.
(2) No net encroachment into the floodplain
will be allowed. Any water storage volume removed from the floodplain must be
accommodated by an equal volume of open storage compensation.
(3) Projects within the St. Johns River Water
Management District which require a permit from the South Florida Water
Management District to drain into the Kissimmee River Basin shall comply with
the criteria set forth in this part.
(4) Other than an approved drainage
connection to the Kissimmee River, the district works or land may not be
utilized as part of the applicant's project.
Notes
Rulemaking Authority 373.044, 373.113 FS. Law Implemented 373.085, 373.413, 373.416 FS.
New 5-1-85.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.