Fla. Admin. Code Ann. R. 40E-63.102 - Definitions
When used in this chapter:
(1) "Best Management Practice (BMP) Plan"
means the plan required by subsection
40E-63.136(1),
F.A.C.
(2) "EAA Basin" means the
entire EAA, which is described in subsection
40E-63.104(2),
F.A.C. (Boundaries).
(3)
"Everglades Agricultural Area Environmental Protection District" (EAA EPD) was
established by the State Legislature as a special district representing
landowners within the EAA Basin for the purposes of ensuring environmental
protection by means of conducting scientific research on environmental matters
related to air and water and land management practices and implementing the
financing, construction, and operation of works and facilities designed to
prevent, control, abate or correct environmental problems and improve the
enivronmental quality of air and water resources.
(4) "FDEP Comprehensive Quality Assurance
Plan" means an approved Florida Department of Environmental Protection (FDEP)
plan pursuant to Rule Chapter 62-160, F.A.C., which specifies the proper field
sampling procedures and protocols for particular projects which include
sampling equipment, equipment cleaning and preparation procedures, sample
collection procedures, sample preservation protocols, sample storage and
transport protocols, and sample chain-of-custody protocols and
documentation.
(5) "Individual
Permit" means a single permit issued to any entity, and the owners of all
parcels which discharge water tributary to the structures identified in the
permit, that is responsible for implementing Best Management Practices and
conducting water quality monitoring for all lands specified within the
permit.
(6) "Land Practice" means
agricultural or other activities conducted on a parcel pursuant to an approved
BMP Plan.
(7) "Land Practice
Change" means any change in the use of a parcel which is likely to result in
significant changes to the scope or type of Best Management Practice specified
in the permitted BMP Plan for the parcel or in the effectiveness of the Best
Management Practice specified in the permitted BMP Plan.
(8) "Master Permit" means a single permit
issued for the entire Everglades Agricultural Area to a legally responsible
entity that provides an opportunity to achieve collective compliance with the
provisions of this chapter.
(9)
"Parcel" means a contiguous land area under single ownership within the
Everglades Agricultural Area Basin.
(10) "Structure" means a structural device or
hydrologic feature through which water is discharged from a parcel or parcels
to a receiving water.
(11) "Total
Phosphorus" means the amount of phosphorus in an unfiltered sample which has
been converted to ortho phosphate by an acid persulfate digestion.
(12) "Water Management System" means the
collection of devices, improvements or natural systems whereby surface
watersare conveyed, controlled, impounded or obstructed.
Notes
Rulemaking Authority 373.044, 373.113 FS. Law Implemented 373.016, 373.085, 373.086, 373.451, 373.453, 373.4592 FS.
New 1-22-92, Amended 7-7-92, 6-30-97, 6-7-99, 7-3-01.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.