Fla. Admin. Code Ann. R. 61-41.007 - Manufacturer Certification
(1) All
individuals or entities manufacturing buildings or components for installation
in Florida must be certified by the Department. In the event that a
manufacturer has more than one facility producing manufactured buildings, the
manufacturer shall obtain certification for each such facility
individually.
(2) Initial
Certification Requirements - A manufacturer must submit to the Agency for
validation to the Department the following for certification:
(a) Application Package - A completed
application; application fee; certificate of product liability insurance with
coverage not less than $1, 000, 000, which shall be renewed and posted on the
Building Code Information System at www.floridabuilding.org annually; and a
copy of a contract with a certified Agency for plan review and inspection
services.
(b) Identification of
principals which shall at a minimum include the positions of partners if the
manufacturer is a partnership or its officers, directors, controlling owners
and registered agent if the manufacturer is a corporation.
(c) Description of manufacturing facility
including, at a minimum, the size of shed(s) for weather protection of building
materials and buildings under construction or repair, the size of yard at the
facility for storing buildings and a site plan of the facility.
(d) A Quality Control
Manual.
(3) The
manufacturer shall submit a separate application for each of its plant
locations. The Quality Control Manual shall be kept at each location.
(4) Renewal - The manufacturer shall renew
its certification once every three years and update the information provided in
its initial application using the Building Code Information System.
Manufacturers will be notified electronically at least 90 days prior to the
expiration date of the manufacturer's certification. If the manufacturer does
not complete the renewal information and submit correct fees by the
certification expiration date, certification becomes null and void. The
manufacturer must meet the qualifications in effect upon the date of renewal to
have its certification renewed.
Notes
Rulemaking Authority 553.37(2) FS. Law Implemented 553.381 FS.
New 1-17-72, Amended 2-23-75, 11-14-76, 3-1-80, 11-4-84, Formerly 61-41.07, Amended 1-1-87, 1-1-89, 3-1-95, 9-7-00, 9-13-01, 7-16-03, 5-13-07, 9-13-09, Formerly 9B-1.007.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.