Fla. Admin. Code Ann. R. 62-17.535 - Notification of Construction of Transmission Lines Not Subject to the Act
The notification required pursuant to Section 403.524(4), F.S., shall provide the following information:
(1) Location of the line in terms of county,
or sections/townships/ranges;
(2)
Names or identifiers of connection points, e.g. "X" switchyard to "Y"
substation;
(3) Line size and total
length; and,
(4) If the basis of
the exemption from the Act under Section
403.524, F.S., is construction
of any portion of the transmission line within one or more established
transmission line rights-of-way, documentation of the date each such
right-of-way was established by means of a deed, grant, permit, license or
reservation of easement, final judgment of condemnation or other legal
instrument. If documentation of the date of establishment for such a
right-of-way is not specifically available, the utility shall consult with the
Department as to an acceptable substitute for demonstrating the establishment
of the transmission line right-of-way at least five years prior to the start of
construction.
Notes
Rulemaking Authority 403.523(1) FS. Law Implemented 403.524(4) FS.
New 5-24-10.