Fla. Admin. Code Ann. R. 62-342.600 - Mitigation Service Area
(1) A
Mitigation Service Area will be established for each Mitigation Bank in the
Mitigation Bank Permit under the criteria of Section
373.4136(6),
F.S. Except as provided herein, Mitigation Credits may only be withdrawn to
offset adverse impacts in the Mitigation Service Area . The boundaries of the
Mitigation Service Area shall depend upon the geographic area where the
Mitigation Bank could reasonably be expected to offset adverse
impacts.
(2) A Mitigation Service
Area may be larger than the regional watershed if the Mitigation Bank provides
exceptional ecological value such that adverse impacts to wetlands outside the
regional watershed could reasonably be expected to be adequately offset by the
Mitigation Bank because of local ecological or hydrological conditions. A
Mitigation Service Area may be smaller than a regional watershed , if adverse
impacts throughout the regional watershed cannot reasonably be expected to be
offset by the Mitigation Bank because of local ecological or hydrological
conditions.
(3) Mitigation Service
Areas may overlap and Mitigation Service Areas for two or more Mitigation Banks
may be approved for a regional watershed .
(4) If the requirements in Rule
62-342.300, F.A.C., are met, the
following projects or activities shall be eligible to use a Mitigation Bank ,
notwithstanding the fact that they are not completely located within the
Mitigation Service Area :
(a) Projects with
adverse impacts partially located within the Mitigation Service Area .
(b) Linear projects, such as roadways,
transmission lines, distribution lines, pipelines, or railways.
(c) Projects with total adverse impacts of
less than one-half acre in size.
(5) When Mitigation Credits are applied to
offset adverse impacts within the same regional watershed as the Mitigation
Bank , the Mitigation Credit requirement shall be the same as that specified for
mitigation on the project site.
(6)
When Mitigation Credits are applied to offset adverse impacts outside the
regional watershed , the Mitigation Credit requirement shall be higher than that
specified for mitigation on the project site if necessary to adequately offset
the adverse impacts of the project, except for linear projects, as referenced
in paragraph (4)(b), above, when the impact being offset is within the
Mitigation Service Area of the Mitigation Bank to be used.
Notes
Rulemaking Authority 373.4136(11) FS. Law Implemented 373.4135, 373.4136 FS.
New 2-2-94, Formerly 17-342.600, Amended 12-12-94, 5-21-01.