Fla. Admin. Code Ann. R. 62-610.500 - Description of System
(1) Rapid
infiltration basins (RIBs).
(a) Rapid
infiltration basins involve reuse of reclaimed water by spreading in a system
of basins, RIBs, percolation ponds (cells) which may be underlain with
subsurface drains. The percolation area shall be divided into two or more
basins, RIBs, or cells (each of which need not have identical size and shape)
to allow for alternate loading and resting.
(2) Absorption fields.
(a) This method of land application involves
reuse of domestic reclaimed water through discharge to absorption fields. This
method involves high rates of application of reclaimed water and loading to
subsurface absorption fields, and is distinguished from "drip" irrigation.
Facilities shall be designed so that portions of the absorption field shall be
isolated for alternate loading and resting without interrupting application of
reclaimed water. The application/distribution system shall be designed with
appropriate materials and dimensions compatible with the physical (particularly
soil) conditions at the specific site.
(b) Absorption fields shall be designed to
use the soil/plant overburden. They shall not be designed to have paved or
impervious overburden surfaces. Systems designed with paved or impervious
overburden surfaces shall meet the requirements of Rule
62-610.525, F.A.C. Particular
attention shall be given to the reliability and flexibility of operating and
maintaining the proposed application/distribution system as well as the level
of preapplication treatment and surface drainage effects on the absorption
fields.
(c) Absorption fields shall
be designed and operated to preclude saturated conditions at the ground
surface.
(3) Because of
the somewhat limited ability of these systems to renovate reclaimed water, the
permittee shall, in the engineering report, address (in detail) the ability of
the proposed project to meet ground water criteria at the edge of the zone of
discharge. Projects having hydrogeologic or other project characteristics
unfavorable for achieving the combined objectives of wastewater renovation,
effluent disposal or reuse of reclaimed water, and ground water protection
shall meet the requirements of Rule
62-610.525, F.A.C. New
rapid-rate land application projects involving continuous loading to a single
basin, RIB, percolation cell, or absorption field shall meet the requirements
in Rule 62-610.525,
F.A.C.
Notes
Rulemaking Authority 403.051, 403.061, 403.087 FS. Law Implemented 403.021, 403.051, 403.061, 403.062, 403.085, 403.086, 403.087, 403.088 FS.
New 4-4-89, Formerly 17-610.500, Amended 1-9-96, 4-1-21.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.