Fla. Admin. Code Ann. R. 62-620.410 - General Application Requirements
(1)
The Department of Environmental Protection Guide to Permitting Wastewater
Facilities or Activities Under Chapter 62-620, F.A.C., contains the general
application requirements for a permit for wastewater facilities or activities,
except for collection and transmission systems permitted under Chapter 62-604,
F.A.C. The application requirements for minor modifications to a wastewater
facility or activity include a description of the proposed modification and, if
applicable, any reports, plans, and specifications which were developed to
implement the modification. The application for minor modification to a
wastewater facility or activity shall be made on DEP Form
62-620.910(9).
(2) An applicant for a permit for a new or
substantially modified wastewater facility or activity shall submit an
application to the Department at least 180 days before a discharge occurs from
the facility or activity. An applicant shall apply at least 90 days before
construction commences on a new or modified wastewater facility or
activity.
(3) An applicant shall
submit as part of the application for a permit a preliminary design or
engineering report and other information in accordance with the Department of
Environmental Protection Guide to Permitting Wastewater Facilities or
Activities Under Chapter 62-620, F.A.C. A report substantively addressing all
of the elements listed in the Guide shall be submitted at least 90 days before
construction commences on a facility or activity which discharges solely to
surface waters or on a component of a facility or activity which discharges
solely to surface waters if the applicant can demonstrate that the component is
separable from the entire facility or activity. For all other facilities or
activities, the report shall be submitted and made complete with the
application for permit.
(4)
Initiation or commencement of construction means to begin performing on-site
modification, fabrication, erection or installation of a treatment facility or
a conveyance system for the discharge of wastes. For the purposes of the
permit, land clearing and site preparation activities related to this
construction are not included herein; however, before undertaking these
activities, other permits for stormwater discharges from the site may be
required.
(5) An applicant shall
apply to the Department to renew an existing permit at least 180 days before
the expiration date of the existing permit.
(6) Record drawings shall be prepared for new
facilities or for substantial modifications to existing facilities permitted
pursuant to this chapter. Record drawings shall be prepared and distributed as
outlined in the Department of Environmental Protection Guide to Permitting
Wastewater Facilities or Activities Under Chapter 62-620, F.A.C. Notification
of availability of record drawings shall be made on DEP Form
62-620.910(13).
(7) An applicant for a permit for a new
wastewater facility or activity, or for substantial modifications to an
existing wastewater facility or activity, shall submit DEP Form
62-620.910(12),
Notification of Completion of Construction for Wastewater Facilities or
Activities, upon completion of construction.
Notes
Rulemaking Authority 403.061, 403.087 FS. Law Implemented 403.051, 403.061, 403.087, 403.088, 403.0885 FS.
New 11-29-94, Amended 12-24-96, 10-23-00.