(1) The maximum
application quantity of biosolids for land reclamation projects shall be
limited to 50 dry tons/acre with such one-time reclamation project to be
accomplished within a one-year period on any acre of a land reclamation site .
When composted biosolids or biosolids blended with other soil amendment
materials are used, only the biosolids portion of the blended product shall
count toward the 50 dry tons/acre limitation.
(2) Except for Class AA biosolids the applied
material shall be incorporated into the soil within the same day as
application.
(3) Seed, turf-forming
grass or other vegetative cover approved by the Department , shall be planted as
soon as possible but in no case later than three months after the application
of biosolids .
(4) Topographical
grading shall be completed before application begins.
(5) Ground water and surface water monitoring
shall be conducted for reclamation sites as provided in paragraphs
62-640.650(3)(c) and
(d), F.A.C.
(6) In addition to the above requirements,
land reclamation projects at mining reclamation sites shall be in compliance
with any other applicable Department rules concerning mining
reclamation.
Notes
Rulemaking Authority 373.043, 403.051, 403.061, 403.062, 403.0855, 403.087, 403.088, 403.704, 403.707 FS. Law Implemented 373.4595, 403.021, 403.051, 403.061, 403.0855, 403.087, 403.088, 403.0881, 403.702, 403.704, 403.707, 403.708 FS.
New 8-12-90, Formerly 17-640.800, Amended 3-30-98, 8-29-10, 6-21-21.