Fla. Admin. Code Ann. R. 62-673.220 - Applicability
(1) The provisions
of this chapter apply to new phosphogypsum stack systems or lateral expansions
of existing phosphogypsum stack systems for which a complete permit application
or request for modification of an existing permit is submitted after 3-25-93.
(a) Except for incidental deposits of
phosphogypsum entrained in the process wastewater, placement of phosphogypsum
outside the phosphogypsum stack footprint is considered a lateral expansion of
the phosphogypsum stack system. The footprint is defined as the outside edge of
the starter dikes used to contain the placement of phosphogypsum in the
stack.
(b) Storage or containment
of process wastewater outside the footprint of the phosphogypsum stack, cooling
ponds, surge ponds, or perimeter drainage conveyances existing on 3-25-93 is
considered a lateral expansion of the phosphogypsum stack system. The footprint
is defined as the outside edge of the dams, dikes or ditches used to store or
contain process wastewater.
(2) Rule 62-673.500, F.A.C., shall also apply
to existing active facilities after 3-25-93 at the time of permit renewal, or
upon issuance of a temporary operating permit.
(3) Rules
62-673.600 -.650, F.A.C., apply
to all phosphogypsum stack systems, whether planned, active, or inactive as
described in subsection
62-673.600(1),
F.A.C.
(4) Lateral expansions of
phosphogypsum stack systems are considered existing installations as defined in
Chapter 62-522, F.A.C.
(5)
Notwithstanding the provisions of paragraph (1)(a), of this rule, placement of
phosphogypsum into an existing process wastewater area located adjacent to and
extending to no more than 350 feet from the edge of the footprint of an
existing phosphogypsum stack is not considered a lateral expansion if:
(a) By [3-25-93 + 3 months], the owner or
operator of the phosphogypsum stack system submits to the Department an
application for a construction permit for the additional placement area which
demonstrates that such placement will not result in a violation of applicable
Department ground water standards or criteria;
(b) By [3-25-93 + 3 months], the owner or
operator of the phosphogypsum stack system submits to the Department an
application, which includes detailed design features, for a permit to construct
a new lined cooling pond which meets the design requirements of Rule
62-673.400, F.A.C., and this
cooling pond is constructed within two years of the issuance of the
construction permit; and
(c) No
phosphogypsum is placed in any unlined area after [3-25-93 + 8
years].
Notes
Rulemaking Authority 403.061, 403.4154, 403.704 FS. Law Implemented 403.4154, 403.707 FS.
New 3-25-93, Formerly 17-673.220.