Fla. Admin. Code Ann. R. 62-673.610 - Closure Plan Requirements
All closure plans shall address the following requirements, or shall contain an explanation of why the requirement is not applicable. Valid information on record in an existing permit or approved groundwater monitoring plan may be used to satisfy the applicable requirements of this rule.
(1) General information report. This report
shall contain:
(a) Identification of the
phosphogypsum stack system;
(b)
Name, address and phone number of primary contact persons;
(c) Identification of persons or consultants
preparing this report;
(d) Present
property owner and phosphogypsum stack system operator;
(e) Location by township, range and section,
and latitude and longitude of the phosphogypsum stack system;
(f) Total acreage of the phosphogypsum stack
system and total acreage of the facility property;
(g) Legal description of the property on
which the phosphogypsum stack system is located; and,
(h) History of the phosphogypsum stack
system, including construction dates and a general description of
operations.
(2) Area
information report. A report on the area in which the phosphogypsum stack
system is located shall be included in the closure plan. The report may use
verifiable information available from published documents. The term "area"
means that area which may affect or be affected by the phosphogypsum stack
system, and at a minimum includes the land within a one-mile radius of the
phosphogypsum stack system. The report shall be supplemented by maps and
cross-section drawings. The following topics shall be addressed in the report:
(a) Topography;
(b) Hydrology, including surface water
drainage patterns and hydrologic features such as surface waters, springs,
drainage divides and wetlands;
(c)
Geology, including the nature and distribution of lithology, unconsolidated
deposits, major confining units and sinkholes;
(d) Hydrogeology, including depth to
groundwater table, groundwater flow directions, recharge and discharge areas
used by public and private wells within one mile of the phosphogypsum stack
system;
(e) Ground and surface
water quality;
(f) Land use
information. The report shall include a discussion and maps indicating:
1. Identification of adjacent landowners,
2. Zoning,
3. Present land uses; and,
4. Roads, highways, right-of-ways, or other
easements.
(3)
Groundwater monitoring plan and site specific information. The closure plan
shall include an approved groundwater monitoring plan containing site specific
information which meets the criteria specified in subsection
62-522.600(3),
F.A.C.
(4) Assessment of
effectiveness of existing phosphogypsum stack system design and operation.
Based on the area information report and the groundwater monitoring plan, an
assessment shall be prepared which discusses the effects of the phosphogypsum
stack system on adjacent ground and surface waters, and the phosphogypsum stack
system area. Specific concerns to be addressed are:
(a) Effectiveness and results of the
groundwater investigation; and,
(b)
Effects of surface water runoff, drainage patterns, and existing storm water
controls.
(5) Closure
plan performance standards. The closure plan and closure design plan shall be
developed to meet the following performance standards.
(a) Closure plans for phosphogypsum stack
systems shall be designed to:
1. Control,
minimize or eliminate, to the extent necessary to protect human health and the
environment, the post closure escape of phosphogypsum, process wastewater,
leachate, and contaminated runoff to ground and surface waters,
2. Minimize leachate generation,
3. Detect, collect, and remove leachate and
process wastewater efficiently from the phosphogypsum stack system, and promote
drainage of process wastewater from the phosphogypsum stack,
4. Be compatible with any required ground
water or surface water corrective action plan,
5. Minimize the need for further
maintenance.
(b) Closure
plans for phosphogypsum stacks shall include a final cover system designed to:
1. Promote drainage off the stack;
2. Minimize ponding;
3. Minimize erosion;
4. Minimize infiltration into the
phosphogypsum stack;
5. Function
with little or no maintenance.
(c) Closure plans for ponds and drainage
conveyances storing process wastewater shall be designed to:
1. Treat or remove from the ponds and
drainage conveyances all process wastewater as soon as practical, either
through return of the process wastewater to the manufacturing process, transfer
of process wastewater to another pond permitted in accordance with this rule,
in-situ treatment, or by treatment and subsequent discharge of the process
wastewater under an appropriate discharge permit,
2. Place any sludges removed from a pond or
drainage conveyance into an active phosphogypsum stack permitted in accordance
with this rule, or an inactive stack undergoing closure in accordance with this
rule. The closure plan shall contain a detailed description of procedures for
removing or treating the sludges, methods for sampling and testing surrounding
soils, and criteria for determining the extent of removal required to satisfy
the closure performance standards.
(6) Closure design plan. A closure design
plan shall be prepared to meet the closure plan performance standards and shall
be based on the area information report, groundwater monitoring plan, and
assessment of the effectiveness of the existing phosphogypsum stack system
design and operation. The closure design plan shall consist of engineering
plans and a report on closing procedures which shall apply to the closing of
the phosphogypsum stack system and the monitoring and maintenance during the
long-term care period. The closure design plan shall include the following
information:
(a) A plan sheet showing phases
of site closing.
(b) Drawings
showing existing topography and proposed final elevations and grades.
(c) For phosphogypsum stacks, final cover
installation plans showing the sequence of applying final cover, including
thickness and type of material that will be used. All phosphogypsum stacks
shall have a final cover designed to meet the performance standards. Final
cover shall be placed over the entire surface of the phosphogypsum stack. The
final cover shall be vegetated with drought-resistant species to control
erosion, whose root systems will not penetrate any low-permeability barrier
layer. Water balance calculations, based on available climatic data, shall be
prepared which estimate the rates and volumes of water infiltrating the cover
systems, collected by any leachate control system, and migrating out of the
bottom of the stack or liner system. Final cover may consist of synthetic
membranes, soils, or chemically or physically amended soils or phosphogypsum.
1. Side slopes and all other grades shall be
designed to minimize erosion of the final cover material. Such designs shall
consider the erosion susceptibility of the material proposed for final cover
relative to historical rainfall patterns for the area, the ability to establish
and maintain vegetation and special maintenance procedures proposed to insure
that infiltration and erosion are minimized. If the side slopes of any stack
are steeper than a two-foot horizontal run to one foot vertical rise, the
closure design plan shall include a stability analysis demonstrating the
longterm stability of the area.
2.
Top gradients of final cover on phosphogypsum stacks shall be designed to
prevent ponding or low spots and minimize erosion.
a. The final cover on the top gradient shall
consist of a barrier soil layer at least 18 inches thick, emplaced in 6-inch
thick lifts. A final, 18-inch thick layer of soil or amended phosphogypsum that
will sustain vegetation to control erosion shall be placed on top of the
barrier layer. For unlined stacks, the barrier layer shall have a maximum
permeability of 1 x 10-7 cm/sec; for
lined stacks, the barrier layer shall have a maximum permeability of 1 x
10-5 cm/sec. If less permeable soils are used, the
thickness of the barrier layer may be decreased to 12 inches provided that
infiltration is minimized to an equivalent degree.
b. A geomembrane may be used as an
alternative to the low-permeability soil barrier for a final cover, constructed
to preclude rainfall infiltration into the stack. A geomembrane used in final
cover shall be a semi-crystalline thermoplastic at least 40 mils thick, or a
non-crystalline thermoplastic at least 30 mils thick, with a maximum water
vapor transmission rate of 2.4 grams per square meter per day, have chemical
and physical resistance to materials it may come in contact with, and withstand
exposure to the natural environmental stresses and forces throughout the
installation, seaming process, and settlement of the phosphogypsum during the
closure and long-term care period. A protective soil layer at least 24 inches
thick shall be put on top of the geomembrane. Material specifications,
installation methods, and compaction specifications shall be adequate to
protect the barrier layer from root penetration, resist erosion, and remain
stable on the final design slopes. This layer shall include soils or amended
phosphogypsum that will sustain vegetative growth.
3. The closure design plan shall describe
provisions for cover material for long-term care erosion control, filling other
depressions, maintaining berms, and general maintenance of the phosphogypsum
stack, and shall specify the anticipated source and amount of material
necessary for proper closure of the stack.
(d) The type of leachate control system
proposed. The leachate control system shall be designed to prevent leachate
from causing violations of water quality standards beyond the approved zone of
discharge for the phosphogypsum stack system in accordance with Chapters 62-520
and 62-522, F.A.C.
(e) Compliance
with groundwater protection requirements. The closure design plan shall show
how the phosphogypsum stack system will meet the water quality standards of
Chapter 62-520, F.A.C. The groundwater monitoring plan and sampling schedule
may be adjusted for a phosphogypsum stack system where groundwater
contamination is not evident or corrective measures have been taken to correct
contamination.
(f) The proposed
method of stormwater control. This shall include control of stormwater
occurring on the phosphogypsum stack system. Stormwater or other surface water
which mixes with leachate shall be considered to be leachate and shall be
treated to meet the applicable water quality standards of Chapter 62-302,
F.A.C., at the point of discharge. The stormwater control plan shall meet the
requirements of Chapter 62-25, F.A.C.; however, nothing herein shall be
construed to preclude application of the requirements of the appropriate water
management district.
(g) The
proposed method of access control. The closure design plan shall describe how
access to the closed phosphogypsum stack system shall be restricted to prevent
any future waste dumping or use of the phosphogypsum stack system by
unauthorized persons. Restricted access shall remain in force until the
phosphogypsum stack system is stabilized and there is no evidence that the
property is being used as an unauthorized dump site.
(h) A description of any proposed final use
of the phosphogypsum stack system.
(i) Closure construction quality assurance
plan. A detailed construction quality assurance plan shall be developed for
construction activities associated with the closure of the phosphogypsum stack
system, including each component of the final cover system. The plan shall
specify quality assurance test procedures and sampling frequencies. Records
shall be kept to document construction quality and demonstrate compliance with
plans and specifications. Upon completion of closure activities a final
construction quality assurance report shall be submitted to the Department,
prepared by a registered professional engineer. The final report shall include
at least the following information:
1. Listing
of personnel involved in closure construction and quality assurance activities,
2. Scope of work,
3. Outline of construction activities,
4. Quality assurance methods and
procedures,
5. Test results
(destructive and non-destructive, including laboratory results); and,
6. Record
drawings.
(7)
Closure operation plan. A closure operation plan shall be included in the
closure plan, and shall:
(a) Describe the
actions which will be taken to close the phosphogypsum stack system, such as
placement of cover, grading, construction of berms, ditches, roads,
retention-detention ponds, installation or closure of wells and boreholes,
installation of fencing or seeding of vegetation, protection of on-site
utilities and easements;
(b)
Provide a time schedule for completion of the closing and long-term
care;
(c) Contain appropriate
references to the closure design plan, area information report, groundwater
monitoring plan, and other supporting documents;
(d) Describe the proposed method of
demonstrating financial responsibility for the long-term monitoring and
maintenance;
(e) Indicate any
additional equipment and personnel needed to complete closure of the
phosphogypsum stack system; and,
(f) Describe any proposed use of the system
for water storage or water management.
(8) Certification by registered professional
engineer. Information, plans, and drawings presented in support of a closure
plan shall be prepared under the direction of, and certified by, a registered
professional engineer authorized to practice in the State of Florida in
accordance with the provisions of Chapter 471, F.S. A letter of appointment
shall be submitted by the proper company official confirming that the engineer
is authorized to prepare plans and specifications. The professional engineer or
another qualified engineer shall be required to make periodic inspections
during the closing of the phosphogypsum stack system to insure closure is being
accomplished according to the closure plan.
(9) Nothing in the section is intended to
preclude the construction of a lined cooling pond on top of an inactive
phosphogypsum stack, as long as the pond is constructed in accordance with the
applicable provisions of this chapter, and as long as the design is included in
the closure plan. Within such a cooling pond, the requirements for minimizing
ponding and establishing vegetation cover are not
applicable.
Notes
Rulemaking Authority 403.061, 403.4154, 403.704 FS. Law Implemented 403.4154, 403.707 FS.
New 3-25-93, Formerly 17-673.610.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.