Fla. Admin. Code Ann. R. 62D-5.074 - Compliance Responsibilities
Subsections 62D-5.070(12) -(16), F.A.C., and the following constitute the general requirements for program compliance.
(1) SITE
DEDICATION. Land owned by the grantee, which is developed or acquired with LWCF
funds, shall be dedicated in perpetuity as an outdoor recreation site for the
use and benefit of the public. Land which is leased from the federal government
or another public agency by grantee must include safeguards to ensure the
perpetual use requirement contained in the Land and Water Conservation Fund
Act. Safeguards include such things as joint sponsorship of the project or an
agreement between the parties that the lessor would assume compliance
responsibility for the project site in the event of default by the lessee
(grantee) or termination or expiration of the lease. These dedications must be
recorded in the county's public property records by the grantee.
(2) MANAGEMENT OF PROJECT SITES. Grantees
shall ensure by site inspections that the property acquired or developed with
LWCF are being operated and maintained for outdoor recreation purposes. All
projects shall be open at reasonable times and shall be managed in a safe and
attractive manner appropriate for public use. Facilities shall be kept in
reasonable repair for a minimum of 25 years from the date set forth on the
project completion certificate to prevent undue deterioration.
(3) CONVERSION. Should a grantee, within the
period of dedication, convert all or part of the project site to other than
public outdoor recreational uses, the grantee shall replace the area,
facilities, resource or site at its own expense with an acceptable project of
comparable or greater value, scope and quality pursuant to section 675.9.3 of
the Manual.
(4) NON-COMPLIANCE.
Before a project is closed, the Department and the NPS shall have the right to
terminate a project agreement and demand return of the program funds for
non-compliance by a grantee. Failure by a grantee to comply with the provisions
of this Part or the project agreement will result in the Department declaring
the grantee ineligible for further participation in LWCF until such time as
compliance has been obtained as determined by the Department under this rule
and the Manual.
(5) INSPECTIONS.
Department staff shall periodically inspect program projects to ensure
compliance with subsections (1), (2), and (3), of this rule, and section 675.9
of the Manual.
Notes
Rulemaking Authority 258.007 FS. Law implemented 258.004, 258.007, 375.021(4) FS.
New 7-15-01.