Ga. Comp. R. & Regs. R. 120-3-24-.04 - Registration of Industry and Manufacturing Processes and Compliance with Codes and Standards Adopted
(1)
All new and existing facilities that have operations involving the
manufacturing, processing, and/or handling combustible particulate solids shall
register by electronic means with the Commissioner including any industry that
has manufacturing processes which create combustible dust. So as to allow for
an orderly implementation of the on line data registration and reporting
system, entities are directed to the following link
http://www.gainsurance.org/safetymfg/home.aspx
to determine exact registration and reporting dates for industries of concern.
The particular industry will be identified by posting the SIC Codes (Standard
Industrial Classification Codes) that appear in a company's disseminated EDGAR
filings (the Electronic Data Gathering, Analysis, and Retrieval system) that
indicates the company's type of business. The posting will provide a minimum of
30 days notice prior to the due date of their first electronic report. Such
notification will begin no later than July 1, 2010. Each facility of the
industry type posted for the notification for registering and reporting shall
use the same link;http://www.gainsurance.org/safetymfg/home
.aspx to complete the registration process and file any additional data or
report required to be filed that has been deemed necessary by the Commissioner
to ensure compliance with these rules and regulations.
(a) Registration shall indicate the following
regarding the individual industry facility and information shall be kept
current:
Industry Information Geo Code Location
Facility Name: Latitude:
Physical Address: Street, City, Zip code Longitude:
Mailing Address: Street, City, Zip code County:
Main Telephone Number Census Tract:
SIC and NAICS Codes Census Block:
(b) Registration shall indicate the
following regarding the individual whom management has designated to be
responsible for filing electronic reports as required by this Chapter. This
individual shall be known as the "Authorized Agent"and contact information for
the Authorized Agent shall be kept current:
Authorized Agent
Contact name:
Telephone Number:
E-mail Address:
(c) Other information deemed necessary by the
Commissioner which may include but is not limited to emergency information,
equipment type, possible ignition sources, process/industry type corporate and
physical facility information.
(2) Material safety data sheets for products
being processed or used during the manufacturing process shall be kept on file
and readily available and accessible upon request and/or in the event of an
emergency and shall contain all pertinent data regarding the properties of the
particular substances involved in the manufacturing process. Such data sheets
shall provide information for workers and emergency personnel on procedures for
handling or working with that substance in a safe manner, and shall includes
information such as physical data (melting point, boiling point, flash point,
etc.), toxicity, health effects, first aid, reactivity, storage, disposal,
protective equipment, and spill handling procedures. All material safety data
sheets on file shall be made current anytime there is an update, addition, or
modification to existing material safety data sheets or when there are changes
in the materials being process, stored, or handled.
(3) Detailed information shall be recorded
and kept on file anytime changes occur in the operation process, new equipment
is introduced, changes occur in existing equipment, and/or changes occur in the
materials being processed, stored, or handled. This information shall be
readily available and accessible upon request and/or in the event of an
emergency.
(4) In addition, all
operations of manufacturing, processing, and/or handling combustible
particulate solids including manufacturing processes that create combustible
dust covered under this Chapter shall comply with the provisions specified
herein with the exclusion of the existing building construction as specified.
Any new construction modification or renovation shall comply with the new
construction provisions and operation provisions established within this
Chapter and the standards adopted herein whether such construction requires
permitting or approval at the state or local level. Any modification or
renovation of existing equipment or any installation of new equipment or any
new processes shall comply with the new provisions established within this
Chapter and the standards adopted herein whether such modification, renovation
of existing equipment or any installation of new equipment or any new processes
requires permitting or approval at the state or local
level.