Ga. Comp. R. & Regs. R. 391-3-2-.09 - Dewatering Wells
(1)
Any person withdrawing ground water in excess of 100,000 gallons per day for
dewatering the subsurface rock to a depth of not more than thirty (30) feet, or
to a greater depth if approved by the Division, for the purpose of construction
of trenches for sewer or water pipes, or excavation for foundations, or utility
construction shall be excluded from obtaining a permit to withdraw ground
water, provided such use is for a period of not more than sixty (60) days,
unless an extension of time is approved by the Division for a justifiable
reason.
(2) Any person withdrawing
in excess of 100,000 gallons per day for dewatering the subsurface rock for any
purpose other than stated in Paragraph (1) of this Rule shall make application
for a permit to withdraw, obtain or utilize ground water to the Division as
required in Rule
391-3-2-.04 of this
Chapter.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.