Haw. Code R. §§ 11-261.1058 - Standards: Pumps and valves in heavy liquid service, pressure relief devices in light liquid or heavy liquid service, and flanges and other connectors

(a) Pumps and valves in heavy liquid service, pressure relief devices in light liquid or heavy liquid service, and flanges and other connectors shall be monitored within five days by the method specified in § 261.1063(b) if evidence of a potential leak is found by visual, audible, olfactory, or any other detection method.
(b) If an instrument reading of 10,000 ppm or greater is measured, a leak is detected.
(c)
(1) When a leak is detected, it shall be repaired as soon as practicable, but not later than 15 calendar days after it is detected, except as provided in § 261.1059.
(2) The first attempt at repair shall be made no later than 5 calendar days after each leak is detected.
(d) First attempts at repair include, but are not limited to, the best practices described under § 261.1057(e).
(e) Any connector that is inaccessible or is ceramic or ceramic-lined (e.g., porcelain, glass, or glass-lined) is exempt from the monitoring requirements of paragraph (a) of this section and from the recordkeeping requirements of § 261.1064 of this subpart.

Notes

Haw. Code R. §§ 11-261.1058
[Eff 7/17/2017] (Auth: HRS §§ 342J-4, 342J-31, 342J-35) (Imp: HRS §§ 342J-4, 342J-31, 342J-35) Am and Comp 9/30/2018 Comp 6/25/2020 Comp 6/7/2021 Am and comp 1/29/2024