Haw. Code R. § 11-262-23 - Use of the manifest
(a) The generator
must:
(1) Sign the manifest certification by
hand; and
(2) Obtain the
handwritten signature of the initial transporter and date of acceptance on the
manifest; and
(3) Retain one copy,
in accordance with subsection 11-262-40(a).
(b) The generator must give the transporter
the remaining copies of the manifest.
(c) For shipments of hazardous waste within
the United States solely by water (bulk shipments only), the generator must
send three copies of the manifest dated and signed in accordance with this
section to the owner or operator of the designated facility or the last water
(bulk shipment) transporter to handle the waste in the United States if
exported by water. Copies of the manifest are not required for each
transporter.
(d) For rail shipments
of hazardous waste within the State which originate at the site of generation,
the generator must send at least three copies of the manifest dated and signed
in accordance with this section to:
(1) The
next non-rail transporter, if any; or
(2) The designated facility if transported
solely by rail; or
(3) The last
rail transporter to handle the waste in the United States if exported by
rail.
(e) For shipments
of hazardous waste to a designated facility in an authorized state which has
not yet obtained authorization by EPA to regulate that particular waste as
hazardous, the generator must assure that the designated facility agrees to
sign and return the manifest to the generator, and that any out-of-state
transporter signs and forwards the manifest to the designated
facility.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.