Haw. Code R. § 11-45-34 - Area radiation survey

(a) An area radiation survey of a new facility or modification to an existing facility shall be conducted by, or under the direction of, a qualified medical physicist within six months after the beginning of its operation to determine compliance with subchapter 4.
(b) The licensee shall forward a report of the area radiation survey to the department within thirty days after the completion of the survey.
(c) A subsequent area radiation survey of the facility shall be conducted if the following occur:
(1) Changes in the number of sources of radiation; or
(2) Changes in the spatial relationship of sources of radiation, relative to walls, partitions, doors, floors, ceilings; or
(3) Changes in workload or utilization of the source of radiation; or
(4) Conditions which may be contrary to subchapter 4.

Notes

Haw. Code R. § 11-45-34
[Eff 11/12/99] (Auth: HRS §§ 321-10, 321-11, 321-71) (Imp: HRS §§ 321-1, 321-11(21), 321-71)