Haw. Code R. § 13-168-13 - Well completion report
Within thirty days after the completion of any well, the well driller or pump installation contractor, as the case may be, shall file with the commission on forms provided by the commission a well completion report containing as appropriate:
(1)
State well number;
(2) Date of
completion;
(3) Tax map
key;
(4) Well head, top of casing,
and ground elevations;
(5) Method
of construction;
(6) Depths,
diameters, and other dimensions of drilled hole;
(7) Depths, diameters, dimensions, and types
of casing and grouting;
(8)
Driller's log of water levels, depths, thickness, and drilling characteristics
of sub-surface formations;
(9)
Pumping test record, including times, rates of pumping, drawdown of the water
level, and chloride content of the pumped water;
(10) Elevation of static water level or
artesian head;
(11) Water
temperature;
(12) Chemical analyses
of a water sample drawn from the well; and
(13) Other information as may be required by
the commission.