Haw. Code R. § 13-183-75 - Well completion

A well is considered to be completed thirty days after drilling operations have ceased and the well is capable of producing a geothermal resource, or thirty days after it has commenced to produce a geothermal resource, unless drilling operations are resumed before the end of the thirty-day period. For the purpose of filing well records, the time limit of sixty days begins either when the well commences production or injection, the drilling operations are suspended for more than thirty days, or the well is abandoned.

Notes

Haw. Code R. § 13-183-75
[Eff. JUN 22 1981] (Auth: HRS § 182-14) (Imp: HRS § 182-14)