Haw. Code R. § 13-183-79 - Surveillance of injection wells
(a) Surveillance of
injection wells shall be necessary in order to establish that all injection
effluent is confined to the intended zone of injection. When an owner or
operator proposes to drill a new well or modify an existing well the owner or
operator shall be required to demonstrate to the satisfaction of the
chairperson that the casing has complete integrity by approved test
methods.
(b) To establish the
integrity of the annular cement above the shoe of the casing, the operator
shall make sufficient surveys, within thirty days after injection is started
into a well, to demonstrate that all the injected fluid is confined to the
intended zone of injection. Surveys shall thereafter be made at least every two
years, or as often as the chairperson may order. All the surveys shall be
witnessed by the chairperson.
(c)
After the injection well has been put into service, the chairperson may visit
the well site periodically. At these times, surface conditions shall be noted
and if any unsatisfactory conditions exist, the operator shall be notified of
needed remedial work. If this required work is not performed within ninety
days, the permit issued for the well by the chairperson shall be rescinded. If
it is determined that damage is occurring, the chairperson may order that the
repair work be done immediately.
(d) Injection pressures shall be recorded and
compared with the pressure reported on the appropriate forms. Any discrepancies
shall be rectified immediately by the operator. A graph of pressures and rates
versus time shall be maintained by the operator. Reasons for anomalies shall be
promptly ascertained. If these anomalies demonstrate that damage is being done,
the permit issued by the chairperson may be rescinded and injection shall
cease.
(e) At the discretion of the
chairperson, when an injection well has been left idle for a period of two
years or longer, the operator shall be informed by letter that the permit
issued for use of the well for injection purposes has been rescinded. In the
event the operator intends again to use the well for injection purposes, the
operator shall be required to file a new application for permit and demonstrate
to the satisfaction of the chairperson by means of surveys that the injected
fluids will be confined to the intended zone of injection.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.