Haw. Code R. § 13-190.1-21 - Additional requirements for removal of dam or reservoir
(a) No person shall remove any dam,
reservoir, or appurtenant works until written approval is obtained from the
board. The application for removal shall include, but not be limited to, the
following information:
(1) The current height
and storage of the dam;
(2) The
current hazard classification;
(3)
The proposed flow through channel width and side slopes;
(4) A description of and quantitative
analyses of the flow through conditions during the 100-year, 24-hour storm
event including provision for erosion protection;
(5) Evaluation of all potential effects on
life, property, and environment downstream; and
(6) For a partial removal of a dam that will
still store water, the relevant deficiencies X identified in the initial
investigation or inspection reports shall be addressed.
(b) Plans for removal of a dam or reservoir,
shall meet the following requirements:
(1)
The dam shall be excavated down to the level of the natural ground or to
sufficient cut depth to prevent silt previously deposited in the reservoir or
material excavated for the channel from washing downstream. The plan shall
address sediment that has been previously deposited in the reservoir;
(2) The channel shall be of sufficient width
to pass the 100-year, 24-hour flood with maximum depth of five feet of water
anywhere in the channel at any time during the flood. Results of analyses
demonstrating the 100-year, 24-hour flood can be safely passed within the
breached section while maintaining five feet or less of water in the remaining
reservoir shall be submitted for review;
(3) Regardless of the hydraulic requirements,
the bottom width of the channel shall be a minimum of fifteen feet;
(4) The side slopes of the channel shall be
excavated to a slope that is stable, but not steeper than 2:1
(horizontal:vertical). Slope stability analysis that provides an adequate
factor of safety for steeper slopes may be accepted by the department but in no
case steeper than 1:1;
(5) A
detailed flood study for the 100-year storm frequency events shall be performed
for the existing conditions and proposed removed or partially removed
dam;
(6) If the partially removed
dam will store more than 2 million gallons (6 acre-feet) of water, the plan
shall provide a dam break inundation map of the downstream community at risk
from the altered dam structure, assuming full water level at the time of
failure;
(7) Transitions to
downstream channels shall be investigated and appropriate provisions made to
mitigate against possible damage or flooding;
(8) The exposed slopes within the 100-year,
24-hour storm depth shall be protected with riprap, vegetation, or other
suitable means to prevent headcutting, downcutting, and lateral slope erosion;
and
(9) The reservoir shall be
emptied before removal of the dam.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.