Haw. Code R. § 19-129-4 - Use of traffic control devices
(a) Traffic control
devices shall be employed at the site of any construction, maintenance,
engineering survey, or any other work where the work may cause a hazardous and
dangerous traffic conditions which will endanger passing motorists,
pedestrians, or workers on the public streets or highways.
(b) Traffic control devices shall be in place
prior to the start of any construction, maintenance, engineering survey, or any
other work. They shall remain in place during the time the obstruction or
danger exists, and shall be removed when the obstruction or danger of
obstruction is removed or ceases.
(c) Where work is performed in stages, there
shall be in place only those devices that apply to the conditions and
activities present during the stage in progress. Signs shall be covered or set
aside out of view of traffic at times when they do not describe the activity
going on or the condition of the street or highway.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.