Haw. Code R. § 19-129-4 - Use of traffic control devices

(a) Traffic control devices shall be employed at the site of any construction, maintenance, engineering survey, or any other work where the work may cause a hazardous and dangerous traffic conditions which will endanger passing motorists, pedestrians, or workers on the public streets or highways.
(b) Traffic control devices shall be in place prior to the start of any construction, maintenance, engineering survey, or any other work. They shall remain in place during the time the obstruction or danger exists, and shall be removed when the obstruction or danger of obstruction is removed or ceases.
(c) Where work is performed in stages, there shall be in place only those devices that apply to the conditions and activities present during the stage in progress. Signs shall be covered or set aside out of view of traffic at times when they do not describe the activity going on or the condition of the street or highway.

Notes

Haw. Code R. § 19-129-4
[Eff: AUG 26 1982] (Auth: HRS § 286-8) (Imp: HRS § 286-8)

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.