Ill. Admin. Code tit. 35, § 364.204 - F2 Factor
F2 is a factor which evaluates the adequacy of existing facilities for treating the existing wastewater load to design levels. It is calculated as follows:
|
F2 |
= |
PE BOD, (existing wastewater load, industrial and domestic) |
|
PE BOD, existing design capacity |
|
x |
daily average flow, existing load |
+1 |
|
daily average flow, existing design capacity |
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.