Upon the consent of the permittee, the Agency may modify a
permit to make the corrections or allowances for changes in the permitted
activity listed in this Section, without following the procedures of 35 Ill.
Adm. Code 705. Any permit modification not processed as a minor modification
under this Section must be made for cause and with a 35 Ill. Adm. Code 705
draft permit and public notice as required in Sections
704.261 through
704.263. Minor modifications may
only involve the following changes:
a)
Correcting typographical errors;
b)
Requiring more frequent monitoring or reporting by the permittee;
c) Changing an interim compliance date in a
schedule of compliance, provided the new date is not more than 120 days after
the date specified in the existing permit and does not interfere with
attainment of the final compliance date requirement; or
d) Allowing for a change in ownership or
operational control of a facility where the Agency determines that no other
change in the permit is necessary, provided that a written agreement containing
a specific date for transfer of permit responsibility, coverage, and liability
between the current and new permittees has been submitted to the Agency;
or
e) Changing quantities or types
of fluids injected that are within the capacity of the facility as permitted
and which the Agency has determined would not interfere with the operation of
the facility or its ability to meet conditions described in the permit and
would not change its classification.
f) Changing construction requirements
approved by the Agency pursuant to 35 Ill. Adm. Code
704.182 (establishing UIC permit
conditions), provided that any such alteration must comply with this Part and
35 Ill. Adm. Code
702 and
730.
g)
Amending a plugging and abandonment plan that has been updated under Section
704.181(e).
h) Amending a Class VI injection well testing
and monitoring plan, plugging plan, post-injection site care and site closure
plan, or emergency and remedial response plan, where the Agency determines that
the modifications merely clarify or correct the plan.
BOARD NOTE: Derived from
40 CFR
144.41(2011).