Ill. Admin. Code tit. 77, § 820.100 - Permits
a) Construction
Permit. A construction permit shall be obtained prior to beginning any
construction, major alteration or installation of a swimming
facility.
b) Procedure to Obtain a
Construction Permit
1) The owner or his or
her representative shall contract with a project designer from the Department's
list of prequalified architects or prequalified professional engineers (see
http://www.idph.state.il.us/envhealth/swimmingpools.htm)
who shall submit a completed application for a construction permit to the
Department. The application forms are available from the Department.
2) One set of detailed construction plans and
specifications, each bearing the seal and signature of a prequalified engineer
or architect licensed to practice in Illinois, shall be submitted for initial
review. However, three sets of the drawings shall be submitted prior to the
issuance of a construction permit. These plans and specifications shall comply
with the following requirements:
A) All plans
and specifications shall be clear, consistent and legible and include the name
of the project location, the scale in feet, the north point and date.
B) Detailed plans shall consist of plan view,
elevations, sections and supplementary views and specifications. Dimensions and
relative elevations of structures and equipment, location and size of piping,
water levels, ground elevations, and pump curve or curves shall be included.
The plans and specifications shall indicate compliance with all applicable
requirements.
C) No change in
location or construction of the project shall be made from plans and
specifications that have been approved without first submitting details of the
proposed changes to the Department and receiving subsequent approval.
3) Construction Requirements in
Flood Plains
A) Scope. All construction, major
alteration or installation shall be built in accordance with the flood damage
prevention standards of the Department of Natural Resources (Regulation of
Construction within Flood Plains).
B) Verification of Compliance. When
construction, major alteration or installation is proposed in a flood plain,
the applicant shall determine if the site is in a Special Flood Hazard Area.
The Special Flood Hazard Area Location Request Form, available from the
Department, shall be completed and submitted to the Department. If the site is
located in a Special Flood Hazard Area, plans for the project shall be
forwarded to the Illinois Department of Natural Resources. No project to be
located in a Special Flood Hazard Area shall be approved without written
approval from the Illinois Department of Natural Resources.
c) Revised Plans and
Specifications. If Department review of the submitted documentation identifies
the need for correction to the plans, specifications or both, corrected copies
shall be submitted with the appropriate fee stated in Appendix B.Tables F, G
and H. If the revised documentation is satisfactory pursuant to this Section,
the Department will issue a construction permit.
d) Notification after the Issuance of a
Construction Permit. The facility owner or permit applicant shall notify the
appropriate Department regional office or authorized agent, as specified with
the issuance of the permit, when construction, major alteration or installation
of the project has been initiated and again when construction, major alteration
or installation has been completed.
1) An
owner of a new swimming facility, or a facility that has undergone construction
or major alteration or replacement of the swimming facility structure, shall
not operate the swimming facility, or allow the swimming facility to be
operated, until the Department has issued a license to operate. To apply for a
license, an original license application form shall be completed and submitted
to the Department with the appropriate fee stated in Appendix B.Tables F, G and
H. The license applicant shall contact the appropriate regional office to make
arrangements for an inspection of the facility after making application and
ensuring that the facility is in an operating condition and in compliance with
this Part. A current license to operate a swimming facility that is to undergo
major alterations may be suspended by the Department for the period of
alteration when continued operation poses a risk of harm to patrons of the
swimming facility.
2) The owner,
manager or other responsible party shall keep a set of plans and specifications
bearing the approval stamp of the Department at the swimming facility after the
project has been completed.
e) Alterations or Repairs of Existing
Facilities. Repairs or remodeling of existing swimming facilities must be in
compliance with design requirements in this Part. Alterations that meet the
definition of major alteration (see Section
820.10) shall require a
construction permit.
f) Preliminary
Concept Approval. The Department may review innovative design concepts and
other design features that are not in strict compliance with this Part in
advance of submission of plans and specifications to assure that the proposed
concept or design will meet the intent of this Part. Preliminary concept
reviews may be conducted at the request of the project designer when the
Department determines that an explanation of the innovative concept would aid
in its review.
Notes
Amended at 37 Ill. Reg. 16539, effective October 4, 2013
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.