Ill. Admin. Code tit. 77, § 915.10 - Applications
a) An application
for examination for registration as a licensed water well contractor or water
well pump installation contractor must be received in the office of the
Department of Public Health, Springfield, Illinois, at least 45 days prior to
the date of examination. Applications shall be made on forms provided by the
Department and shall include the following information:
1) Name and address of the
applicant;
2) Age of the
applicant;
3) A statement that the
applicant is a citizen of the United States or has declared his or her
intention to become a citizen of the United States; and
4) Employment records, W-2s, copies of
paychecks, or other evidence that the applicant has been employed in water well
construction or water well pump installation for a minimum of 420 working days
in a maximum of two years.
b) A recent photograph shall be submitted
with the application form and be made a permanent record.
c) Affidavits from previous and current
licensed contractor employers shall accompany the application, indicating the
dates that the applicant was employed and the locations of previous jobs that
the applicant performed, and verifying that the applicant was engaged in water
well or water pump installation work and that he or she performed this work
under the supervision of a licensed contractor. Beginning July 1, 2014, an
applicant for a water well contractor license shall submit copies of at least
10 water well construction reports that identify the applicant as the driller.
To identify himself or herself as the driller, the applicant, along with the
licensed driller performing the supervision, shall sign and date each of the
water well construction reports. An applicant for a water well pump
installation contractor license shall submit copies of at least 10 water well
pump installation reports that identify the applicant as the pump installer. To
identify himself or herself as the pump installer, the applicant, along with
the licensed pump installer performing supervision, shall sign and date the
water well construction report or the water well pump installation report. The
names and addresses of previous licensed contractor employers shall be
included. These affidavits shall be submitted with the application form and
become a permanent record.
d)
Qualifications. The Department will approve an application, provided the
applicant has the following qualifications:
1)
Is at least 18 years of age;
2) Is
a citizen of the United States or has declared his or her intention to become a
citizen of the United States;
3)
Possesses good moral character on the basis of documentation provided by the
applicant's employers' affidavits as required in subsection (c) of this
Section, and that the applicant has no criminal record as described in Section
915.110(g);
4) Has the following experience as documented
according to subsections (a)(4) and (d) of this Section:
A) An applicant for a water well contractor's
license shall have worked two years under the supervision of a licensed water
well contractor;
B) An applicant
for a water well pump installation contractor's license shall have worked two
years under the supervision of a licensed water well pump installation
contractor;
C) An applicant for a
water well and pump installation contractor's license shall have worked two
years for a licensed water well contractor and pump installation contractor;
and
5) Has paid the
required fee in accordance with Section 13 of the Act. (Section 9 of the
Act)
Notes
Amended at 36 Ill. Reg. 9395, effective June 13, 2012
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.