Ill. Admin. Code tit. 77, § 935.35 - Permits
a) General. Section
8 of the Act requires that the applicant submit plans to the Department and
obtain a construction permit from the Department prior to the construction of a
new migrant labor camp or a major alteration or major extension to an existing
migrant labor camp. (B)
b) Plans.
Two sets of plans showing the following information shall be submitted to the
Department by the applicant to obtain a construction permit:
1) Identification of the migrant labor camp
involved and the person or organization preparing the drawings and
specifications.
2) A statement
describing the scope of the work proposed and the anticipated time
schedule.
3) A plan showing
location of all structures and improvements.
4) Drawings and/or specifications for
proposed buildings or structures that include all structural components and
material specifications.
5)
Detailed drawings and specifications of proposed potable water source and
distribution system, and a general drawing showing distances between components
of the potable water system and sources of potential contamination.
6) Detailed drawings and specifications of
proposed sewage system construction, a general arrangement drawing showing
distances between components of the sewage system and potable water systems or
bodies of surface water, and data showing estimated volume of sewage flow and
soil percolation rates for absorption fields. When a permit has been obtained
or applied for from the Environmental Protection Agency or a unit of local
government for construction of a sewage disposal system, a copy of the permit
or permit application shall be submitted.
7) Detailed drawings and specifications for
proposed food service establishment construction showing interior construction
of the building, floors, walls and ceiling, as well as details of food handling
equipment to be installed.
8)
Drawings of proposed electrical distribution system construction showing
general arrangement, size and type of wiring, method of grounding, over-current
protection and type of equipment.
9) Drawings of proposed sewer and water
piping within buildings showing size and location of piping, fittings, and
fixtures, as well as materials of construction, in accordance with the Illinois
Plumbing Code (77 Ill. Adm. Code 890).
10) The maximum number of persons intended to
occupy any new or remodeled housing unit shall be specified. This figure shall
not exceed the capacity of the water and sewage systems provided.
c) Flood Hazard. Prior to the
issuance of a construction permit, the permit applicant shall submit a
completed "Special Flood Hazard Area Request Form" provided by the Department.
If the site is within a Special Flood Hazard Area, the applicant shall forward
to the Illinois Department of Natural Resources the plans for the project. No
project to be located in a Special Flood Hazard Area shall be issued a permit
without a statement or a copy of the statement from the Department of Natural
Resources that the construction complies with the requirements of Executive
Order 79-4 dated May 31, 1979. Construction of such items as water wells,
septic tanks, underground utilities, light poles, pavilions, playground
equipment, sidewalks and driveways as specified in Statewide Permit Number 6
issued by the Illinois Department of Natural Resources, May 13, 1983 are exempt
from the above requirements. (C)
d)
Local Approval. Prior to construction of a new camp, major alteration or major
extension of an existing camp, permits and zoning approval required by local
health departments and zoning boards as well as other governmental units having
jurisdiction shall be obtained by the permit applicant. (C)
e) Existing Facilities. A permit is not
required when existing facilities are utilized for a migrant labor camp. Plans
indicating the general location of all structures and utilities shall be
submitted to the Department. The existing facilities will be inspected by the
Department for compliance with this Part. Any violations identified during the
inspection of the facilities shall be corrected, and the facilities shall be
brought into essential compliance with this Part prior to the issuance of a
license. (C)
f) Repairs. A permit
is not required to repair a facility in a licensed migrant labor camp or to
correct a violation of this Part when such repair or correction is made to an
existing facility and does not result in expansion of any existing appurtenance
or structure.
g) Minor Extension
and Alterations. Construction at a migrant labor camp less than a major
extension or major alteration shall not require a permit. However, prior to
initiating construction, the applicant shall advise in writing the regional
office of the Department which serves the camp of the scope of the alteration.
(C)
h) EPA Approval. The
construction of all community water supply systems and those surface discharge
sewage disposal systems with flows greater than 1,500 gallons per day requires
a construction permit from the Illinois Environmental Protection Agency.
(C)
Notes
Amended at 21 Ill. Reg. 9484, effective July 1, 1997