Iowa Admin. Code r. 567-102.13 - Operating requirements for all sanitary disposal projects
Every application for any permit issued by the
(1) Open
burning shall be prohibited except when permitted by 567-Chapter 23. Any
burning to be conducted at the site shall be at a location and separate and
distinct from the operating area .
(2) Litter shall be confined to the property
on which the sanitary disposal project is located. At the conclusion of each
day of operation, any litter strewn beyond the confines of the operating area
shall be collected and stored in covered leakproof containers or properly
disposed.
(3) Scavenging shall be
prohibited. Any salvaging to be conducted must be described in the permit
application and all salvaged materials must be stored and removed from the
sanitary disposal project site in conformance with the permit
conditions.
(4) Effective means
shall be taken to control flies, other insects, rodents and other
vermin.
(5) Equipment designated in
the plans and specifications or equivalent equipment shall be used to operate
the site at all times.
(6) The
major internal roads shall be of all weather construction and maintained in
good condition. Dust shall be controlled on internal roads.
(7) Sites open to the public shall have a
permanent sign posted at the site entrance specifying:
a. Name of the operation.
b. The site permit number.
c. The hours and days the site is open to the
public.
d. The categories of waste
which will be accepted for disposal or, as an alternative, identifies the
categories of waste which are prohibited.
e. Telephone number of official responsible
for the operation.
(8)
Free liquids or waste containing free liquids. No free liquids or waste
containing free liquids shall be disposed in a sanitary landfill.
(9) General closure requirements.
a. The owner or operator shall notify the
department in writing at least 180 days prior to closure of the facility or
suspension of operations.
b. Notice
of closure shall be posted at least 180 days prior to closure at the facility
indicating the date of closure and alternative solid waste management
facilities. Notice of closure shall also be published at least 180 days prior
to closure in a newspaper of local circulation. This notice shall include the
date of closure and alternative solid waste management facilities.
c. Implementation of the closure/postclosure
plan shall be completed within 90 days of the closure of the facility. The
owner and an engineer registered in Iowa shall certify that the
closure/postclosure plan has been implemented in compliance with the rules, the
closure/postclosure plan and the permit.
d. Upon completion of closure activities,
as-built plans shall be submitted showing changes from the original design
plans, test results indicating compliance with final cover as applicable, waste
removal, equipment decontamination, and other forms of documentation as
required, to include a copy of the notation filed with the county recorder.
This rule is intended to implement Iowa Code section 455B.304.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.