Iowa Admin. Code r. 567-65.204 - Construction permit application
An
(1) Conceptual design. Prior to submitting an
application for a construction permit , the applicant may submit a conceptual
design and site investigation report to the department for review and
comment.
(2) Application for a
construction permit for an open feedlot operation shall be made on a form
provided by the department. The application shall include all of the
information necessary to enable the department to determine the potential of
the proposed settled open feedlot effluent basin or AT system to achieve the
level of control required of the open feedlot operation . A construction permit
application shall include the following:
a.
The name of the owner of the open feedlot operation and the name of the open
feedlot operation , including the owner 's mailing address and telephone
number.
b. The name of the contact
person for the open feedlot operation , including the person's mailing address
and telephone number.
c. The
location of the open feedlot operation .
d. A statement providing that the application
is for any of the following:
(1) The
construction or expansion of a settled open feedlot effluent basin or AT system
for an existing open feedlot operation that is not expanding;
(2) The construction or expansion of a
settled open feedlot effluent basin or AT system for an existing open feedlot
operation that is expanding;
(3)
The construction of a settled open feedlot effluent basin or AT system for a
proposed new open feedlot operation .
e. The animal unit capacity for each animal
species in the open feedlot operation before and after the proposed
construction.
f. An engineering
report, construction plans and specifications prepared by a PE or by an
NRCS -qualified staff person for the settled open feedlot effluent basin or AT
system .
g. A report on the soil and
hydrogeologic information for the site, as described in subrules 65.206(2) and
65.207(4).
h. Information including
but not limited to maps, drawings and aerial photos that clearly show the
location of all the following:
(1) The open
feedlot operation and all existing and proposed settled open feedlot effluent
basins or AT systems, clean water diversions, and other pertinent features or
structures.
(2) Any other open
feedlot operation under common ownership or common management and located
within 1,250 feet of the open feedlot operation .
(3) Any public water supply system as defined
in Iowa Code section 455B.171 or drinking water well
that is located less than the distance from the open feedlot operation required
by rule 567-65.205 (455B,459A). Information shall also be provided as to whether
the proposed settled open feedlot effluent basin or AT system will meet all
applicable separation distances.