Iowa Admin. Code r. 567-71.8 - Pipeline crossings

Approval by the department for the construction, operation and maintenance of buried pipeline crossings is not required if the natural contours of the channel and flood plain are maintained. (NOTE: Approval of stream bank protection measures associated with pipeline crossings may need approval under 567-719. (455B).) Approval by the department for the construction, operation, and maintenance of all other pipeline crossings shall be required in the following instances:

(1) Rural areas. In rural areas, pipeline crossings on any river or stream draining more than 100 square miles.
(2) Urban areas. In urban areas, pipeline crossings on any river or stream draining more than 2 square miles.

Notes

Iowa Admin. Code r. 567-71.8

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.