Kan. Admin. Regs. § 28-35-317 - Operating procedures
(A) Particle
accelerators, when not in operation, shall be secured to prevent unauthorized
use.
(B) Only a switch on the
accelerator control console shall be routinely used to turn the accelerator
beam on and off. The safety interlock system shall not be used to turn off the
accelerator beam except in an emergency.
(C) All safety and warning devices, including
interlocks, shall be checked for proper operability at intervals not to exceed
three (3) months. Results of such tests shall be maintained for inspection at
the accelerator facility.
(D)
Electrical circuit diagrams of the accelerator, and the associated interlock
systems, shall be kept current and maintained for inspection by the department
and available to the operator at each accelerator facility.
(E) If, for any reason, it is necessary to
intentionally bypass a safety interlock or interlocks, such action shall be:
(1) Authorized by the radiation safety
committee and/or radiation safety officer;
(2) recorded in a permanent log and a notice
posted at the accelerator control console; and
(3) terminated as soon as possible.
(F) A copy of the
current operating and the emergency procedures shall be maintained at the
accelerator control panel.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.