Kan. Admin. Regs. § 28-45-16 - Storage well and cavern monitoring
(a) Each permittee shall ensure that each
storage well is equipped with a continuous pressure-monitoring system for both
the product lines and the brine lines of the wellhead. Each permittee shall
maintain the continuous pressure-monitoring data as specified in
K.A.R.
28-45-19 and shall provide
pressure-monitoring data to the department upon request.
(b) Each permittee shall ensure that each
continuous pressure-monitoring system is capable of recording the maximum and
minimum operating pressures at least every 60 seconds during each 24-hour
period.
(c) Each permittee shall
submit a written plan, including logging and sonar surveys, to the department
for the secretary's review and consideration for approval, at least 30 days
before any monitoring activity begins.
(d) Each permittee shall monitor salt roof
thickness for each active well and monitoring status storage cavern with a
gamma ray log and a density log. Each permittee shall comply with the storage
cavern limitations specified in
K.A.R.
28-45-6a. A professional geologist shall
verify the top of salt and effective casing seat. Salt roof thickness shall be
monitored as follows:
(1) Every three years,
if salt roof thickness is less than 100 feet but more than 50 feet;
(2) every five years, if salt roof thickness
is 100 feet or more;
(3) before
conversion to monitoring status or permanent monitoring status;
(4) before plugging; and
(5) at any time the department determines the
mechanical integrity is suspect.
(e) Each permittee shall monitor each storage
cavern that is considered an active well using a sonar survey. The brine string
shall be removed at least for every other sonar survey. The sonar survey shall
be completed as follows:
(1) Before a storage
well is considered an active well;
(2) every five years, if web thickness is
less than 100 feet but more than 50 feet;
(3) every 10 years, if web thickness is 100
feet or more;
(4) before conversion
to permanent monitoring status if a sonar survey has not been completed within
the last five years;
(5) before
plugging; and
(6) at any time the
department determines the mechanical integrity is suspect.
(f) Each permittee shall submit the results
of any monitoring activity and an interpretation of the results to the
department within 90 days of completion.
(g) Each applicant shall submit a subsidence
monitoring plan that complies with the requirements of subsection (h) with the
facility permit application.
(h)
Each permittee shall complete a subsidence monitoring survey biennially. The
subsidence monitoring survey report shall include a description of the method
for conducting an elevation survey and criteria for establishing monuments,
benchmarks, wellhead survey points, and natural or artificial reflectors. The
following requirements shall apply:
(1)
Global positioning system coordinates shall be recorded at each survey
point.
(2) Level measurements to
the accuracy of 0.01 foot shall be made.
(3) Surface elevation changes more than a
rate of 0.10 foot per year shall be reported to the department within 30 days
of detection.
(4) No established
benchmark or artificial reflector shall be changed, unless the permittee
submits justification for the change to the department for the secretary's
review and consideration for approval. If an established benchmark or
artificial reflector is changed, the elevation change from the previous
benchmark shall be noted in the elevation survey report.
(5) Each permittee shall submit the elevation
change before and after any wellhead work that results in a change in the
survey point at the wellhead.
(6) A
professional surveyor shall certify the elevation survey.
(7) Each permittee shall submit biennial
elevation survey results to the department within 90 days of completion. The
elevation survey report shall include a signature by a professional surveyor
certifying the results, a tabulation by well number or measuring point
identifier comparing the most recent survey with the previous survey, and an
interpretation of the results. The permittee shall keep survey field notes on
file and make the notes available to the department upon request.