Kan. Admin. Regs. § 28-45a-10 - Operations and maintenance plan
(a) Each permittee
of an existing underground natural gas storage facility and each applicant for
a permit for a new underground natural gas storage facility shall submit a plan
for the long-term operation and maintenance of the facility with the permit
application.
(b) Each operation
and maintenance plan shall include the following:
(1) A description of the methods to be used
to prevent the overpressuring of wells and storage caverns;
(2) a plan map view of the location of any
disposal wells or corrosion control wells; and
(3) the location, depth, and construction
details for all shallow and deep groundwater monitoring wells.
(c) Each permittee shall maintain
at the facility and make available for inspection by the secretary the
following information:
(1) A location map of
all wells within the facility's boundaries and a listing of the global
positioning system coordinates for each well;
(2) a schematic of the gathering line system
that connects all wells within the underground storage facility to a central
distribution point; and
(3) a
schematic of the product lines for each cavern.
(d) Each permittee shall utilize a blanket
pad to prevent the uncontrolled leaching of the storage cavern roof during
solutioning or washing. Each permittee shall submit the description of a
procedure for solutioning or washing the cavern, with the operations and
maintenance plan, to the secretary for review and consideration for approval.
The procedure description shall include the following:
(1) A list of acceptable blanket pad
materials;
(2) the methods for
monitoring the solutioning or washing process; and
(3) a monitoring schedule.
(e) The criteria for determining
the maximum allowable operating pressure shall be as follows:
(1) The maximum allowable operating pressure
and test pressure shall not exceed 0.75 pounds per square inch per foot of
depth measured at the higher elevation of either the casing seat or the highest
interior elevation of the storage cavern roof.
(2) The storage cavern shall not be subjected
to pressures in excess of the maximum allowable operating pressure, including
pressure pulsations and abnormal operating conditions.
(f) Each permittee shall maintain a minimum
operating pressure that is protective of cavern integrity at each underground
natural gas cavern.
(g) Each
permittee shall meet the notification requirements in the facility's emergency
response plan, give oral notification to the department within two hours, and
submit written notification within one week to the department if any of the
following events occurs:
(1) The
overpressuring of a storage cavern;
(2) the loss of integrity for the underground
natural gas storage well;
(3) the
release of product or any other parameter that poses a threat to public health,
safety, or the environment;
(4)
any other condition that could pose a risk to public health, safety, or the
environment;
(5) the establishment
of communication between caverns;
(6) the triggering of any alarms verifying
that permit safety requirements have been exceeded; or
(7) any equipment malfunction or failure that
could result in potential harm to public health, safety, or the environment.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.