Kan. Admin. Regs. § 5-13-5 - Approval of pit operations that are opened or expanded after the effective date of this regulation
Except as set forth in K.A.R. 5-13-4, pit operations that are excavated or expanded after the effective date of this regulation and that have a substantial adverse impact on the area groundwater supply shall meet one of the following conditions:
(a) Receive
prior approval of the chief engineer for a new permit to appropriate an annual
quantity of water sufficient to offset the evaporation caused by exposing the
groundwater table in a manner described in K.A.R. 5-13-7;
(b) acquire existing water rights and receive
approval of the chief engineer to change the point of diversion, place of use,
and the use made of water to authorize the water rights to be used for the
project in a manner described in K.A.R. 5-13-7;
(c) acquire and take out of production
sufficient water rights in the manner described in K.A.R. 5-13-7 to offset the
net average annual evaporation caused by exposing the groundwater table; or
(d) any combination of the above.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.