Kan. Admin. Regs. § 5-22-4 - Metering
(a) Each water
flowmeter, gauge, or other measuring device required by the district shall meet
the minimum specifications adopted by the chief engineer by regulation.
(b) The owner of the water right
or approval of application shall perform the following:
(1) Ensure that the water flowmeter is
properly installed in accordance with the specifications adopted by the chief
engineer by regulation;
(2)
maintain the water flowmeter in satisfactory working condition whenever the
diversion works can reasonably be expected to operate; and
(3) ensure that the water flowmeter measures
all of the discharge from the diversion works and does not measure any other
discharge, including tailwater and sewage lagoon effluent.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.