Kan. Admin. Regs. § 5-41-5 - Channel changes; disposal of excavated material

(a) Material removed from the newly excavated channel shall be deposited at a location and in a form acceptable to the chief engineer. If the material is to be deposited so that it will have the effect of a levee, a separate prior written approval of the chief engineer is required pursuant to K.S.A. 24-126.
(b) Filling or plugging the original channel shall receive the prior written approval of the chief engineer.

Notes

Kan. Admin. Regs. § 5-41-5
Authorized by K.S.A. 82a-303a; implementing K.S.A. 82a-303; effective May 1, 1987.

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.