Kan. Admin. Regs. § 5-41-5 - Channel changes; disposal of excavated material
(a) Material
removed from the newly excavated channel shall be deposited at a location and
in a form acceptable to the chief engineer. If the material is to be deposited
so that it will have the effect of a levee, a separate prior written approval
of the chief engineer is required pursuant to
K.S.A.
24-126.
(b) Filling or plugging the original channel
shall receive the prior written approval of the chief engineer.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.