02-658 C.M.R. ch. 110, § 7 - HEAT LOSS REQUIREMENT

Current through 2022-14, April 6, 2022

1. New Installations. Heat loss system design and system load calculations for all new installations shall be performed prior to the installation. The licensee must retain a copy of the heat loss system design and system load calculations such that it may be produced for inspection upon request of a Board inspector.
2. Replacement Systems. A heat loss and/or load calculation shall be conducted before replacement. The heat loss and/or load calculation may be obtained from the original design plans. The licensee must retain a copy of the heat loss system design or system load calculations and produce it for inspection upon request of a Board inspector.

Notes

02-658 C.M.R. ch. 110, § 7

The following state regulations pages link to this page.



State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.