02-658 C.M.R. ch. 12, § 2 - Application Procedure

Current through 2022-14, April 6, 2022

12.2.1 Generally

Application for a permit must be made on a form supplied by the Board. The application must be accompanied by detailed plans, including a cross-sectional view, front and side elevations, and plot plans, and the fee set forth in Chapter 10, Section 5(17-A) of the rules of the Office of Professional and Occupational Regulation, entitled "Establishment of License Fees. A permit must be obtained prior to commencement of the installation or alteration.

12.2.2 Change in Tank Capacity, Piping or Operation

Any physical change that would increase the tank capacity or alter the piping or operation of the facility requires that a new application be filed and a new permit be issued.

12.2.2.1 When any individual tank with a water capacity of 5000 gallons or more is replaced, the following must be done:
1. If the facility has not been previously permitted, a new permit must be applied for and granted before the tank is replaced.
2. If the facility has been permitted, the Board must be informed in writing at least 15 days before the tank is replaced.