780 CMR, CHAPTER 51, ch. 4, R404, R404.4 - Wiring for Electric Vehicle Charging Spaces ("EV Ready Spaces").
Add section R404.4 as follows:
EV Ready Spaces shall be provided in accordance with Table R404.4. The branch circuit shall be identified as "EV READY" in the service panel or subpanel directory, and the termination location shall be marked as "EV READY". The circuit shall terminate in a NEMA receptacle or a Society of Automotive Engineers (SAE) standard J1772 electrical connector.
TABLE R404.4 EV READY SPACE REQUIREMENTS
|
Type of Building |
Number of parking spaces |
|
1 & 2 family dwellings and town houses |
At least 1 per unit |
|
Multi-family |
At least 10% |
Exceptions:
Construction documents shall identify the total service load required to serve the residential unit. If the reservation of a 50-ampere branch circuit will require an upgrade to a larger electrical service, the exception shall apply.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.