(1)
All piping shall be run as directly as practicable, shall be protected against
physical damage, and proper allowance shall be made for expansion and
contraction, jarring, and vibration. Piping in a tunnel, trench, or duct shall
be welded or brazed. Pipe laid underground in earth shall be located below the
frost line and shall be protected from corrosion. Shutoff valves shall be
located outside the conduits. Oxygen piping may be placed in the same tunnel,
trench, or duct with fuel gas pipe lines if natural or forced ventilation is
provided.
(2) Low points in piping
carrying moist gas shall be drained into drip pots constructed so as to permit
pumping or draining out the condensate at necessary intervals. A drain valve
shall be installed for this purpose, having an outlet normally closed with
screw caps or plugs. Open end valves or petcocks shall not be used, except
that, in drips located out of doors, underground, and not readily accessible, a
valve may be used at such points if it is equipped with means to secure it in
the closed position. A pipe leading to the surface of the ground shall be cased
or jacketed where necessary to prevent loosening or breaking.
(3) A gas shutoff valve shall be provided at
the pipe entrance to a building. There shall also be provided a shutoff valve
in the discharge line from the generator, gas holder, manifold, or other source
of supply. A shutoff valve shall not be installed in a manner that renders a
safety relief device ineffective.
(4) Before assembly, piping and fittings
shall be freed of scale and dirt. An oxygen line shall be washed out with a
solution such as caustic soda or trisodium phosphate. After assembly, piping
shall be blown out with oil-free air or oil-free inert gas.
(5) Loose dirt that may have been trapped in
the pipe shall be blown out with oil-free air or oil-free inert gas.
(6) Pressure testing of a pipeline shall be
done in a manner to protect an employee from injury due to blowing out of
closures and other pressure restraining devices.
(7) A piping system shall be tested and
proved gastight at 1 1/2 times the maximum operating pressure and shall be
purged of air before being placed in service. The material used for testing
oxygen lines shall be oil-free and noncombustible. A flame shall not be used to
detect leaks.
(8) Repairs on
ferrous piping for other than inert gas lines shall be preceded by purging the
lines, unless only nonsparking tools are used. When gas lines and other parts
of a manifold system are being purged, a source of ignition shall not be
permitted near the uncapped opening.
(9) Outdoor ferrous and all underground
piping and fittings shall be covered or painted to protect against
corrosion.
(10) A steel or wrought
iron pipe joint shall be welded, threaded, or flanged.
(11) A brass or copper pipe joint shall be
welded, brazed, threaded, or flanged. A seamless copper, brass, or stainless
steel tubing joint shall be brazed or gas tubing fittings used. Where a
socket-type joint is used, it shall be brazed with silver brazing alloy or
similar filler metal having a melting point not less than 800 degrees