Mich. Admin. Code R. 408.16355 - Blowing a batch type digester

Rule 6355.

(1) A signal device such as a bell, horn, siren, or light shall be installed in a batch type digester or blow pit room and chip bin and used before and during blowing of the digester.
(2) A signal shall be used to warn an employee in a chip bin before loading the batch type digester.
(3) A blow-off valve shall be opened slowly, and the valve shall be left open until the digester cook signals the blow is completed.
(4) A digester cover shall not be removed until the blow has been completed. An employee removing a digester cover shall wear protective equipment to guard against burns from hot stock and steam.

Notes

Mich. Admin. Code R. 408.16355
1979 AC

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.