Rule 1212.
(1)
Excess tools, materials, and debris shall not be permitted to accumulate on a
scaffold to create a hazard.
(2)
Work on or from scaffolds is prohibited during storms or high winds unless a
competent person has determined that it is safe for employees to be on a
scaffold and that the employees are protected by a personal fall arrest system.
Wind screens shall not be used unless the scaffold is secured against the
anticipated wind forces imposed.
(3) A scaffold shall be kept free of slippery
conditions such as those caused by ice, snow, oil, grease, or other slippery
compounds.
(4) An employee shall
not be allowed within 10 feet of uninsulated electrical energized
lines.
(5) Before a scaffold is
erected within 10 feet of a power line all of the following requirements shall
be met, as applicable:
(a) The utility or
property owner is consulted.
(b) A
power line or electrical apparatus is considered energized unless the property
owner or utility indicates it is de-energized and the line or apparatus is
visibly grounded. If de-energizing is impractical and the equipment is exposed
to contact by an employee, the minimum clearances in table 1 shall be
maintained between the scaffold, employee, or material, whichever is
closer.
(c) The requirements for
employees performing power transmission and distribution work, electrical work,
or telecommunications work are found in Construction Safety Standard Part 16.
"Power Transmission and Distribution," Construction Safety Standard Part 17.
"Electrical Installations," and in Construction Safety and Health Standard Part
30. "Telecommunications for Constructions," as referenced in
R
408.41201.
(6) Table 1 reads as follows:
|
TABLE 1
|
|
INSULATED LINES
|
|
VOLTAGE
|
MINIMUM DISTANCE
|
ALTERNATIVES
|
|
Less than 300 volts
|
3 feet (0.9 meters)
|
|
300 volts to 50 kilovolts
|
10 feet (3.1 meters)
|
|
More than 50 kilovolts
|
10 feet (3.1 meters) plus 0.4 inches (1.0
centimeter) for each kilovolt over 50 kilovolts
|
2 times the length of the line insulator, but
not less than 10 feet (3.1 meters)
|
|
UNINSULATED LINES
|
|
VOLTAGE
|
MINIMUM DISTANCE
|
ALTERNATIVES
|
|
Less than 50 kilovolts
|
10 feet (3.1 meters)
|
|
More than 50 kilovolts
|
10 feet (3.1 meters) Plus 0.4 inches (1.0
centimeter) for each kilovolt over 50 kilovolts
|
2 times the length of the line insulator, but
not less than 10 feet (3.1 meters)
|
(7) Welding, burning, riveting, or open flame
work shall not be performed within 10 feet of fiber or synthetic rope that is
used to suspend a scaffold, unless the rope is protected from sparks, flame, or
hot metal. Only treated or protected fiber or synthetic ropes shall be used for
or near any work that involves the use of corrosive substances or
chemicals.
(8) A suspension rope,
including connecting hardware, used on nonadjustable or adjustable suspension
scaffolds shall be capable of supporting, without failure, not less than 6
times the maximum intended load applied or transmitted to the rope.
(9) If personal fall arrest systems are
required by these rules for the protection of employees, then the arrest system
equipment shall be as prescribed in Construction Safety Standard Part 45. "Fall
Protection," as referenced in
R
408.41201.
(10) To reduce the possibility of welding
current arcing through the suspension wire rope when performing welding from
suspended scaffolds, a welder shall take the following precautions, as
applicable:
(a) An insulated thimble shall be
used to attach each suspension wire rope to its hanging support, such as a
cornice hook or outrigger. Excess suspension wire rope and any additional
independent lines from grounding shall be insulated.
(b) The suspension wire rope shall be covered
with insulating material extending not less than 4 feet (1.2 meters) above the
hoist. If there is a tail line below the hoist, it shall be insulated to
prevent contact with the platform. The position of the tail line that hangs
free below the scaffold shall be guided or retained, or both, so that it does
not become grounded.
(c) Each hoist
shall be covered with insulated protective covers.
(d) In addition to a work lead attachment
required by the welding process, a grounding conductor shall be connected from
the scaffold to the structure. The size of the conductor shall be at least the
size of the welding process work lead, and the conductor shall not be in series
with the welding process or the workpiece.
(e) If the scaffold grounding lead is
disconnected, the welding machine shall be shut off
(f) An active welding rod or uninsulated
welding lead shall not be allowed to contact the scaffold or its suspension
system.