Mich. Admin. Code R. 408.41474 - Blasting

Rule 1474.

(1) All blasting and explosives handling shall be conducted as prescribed in Construction Safety Standard Part 27 "Blasting and Use of Explosives," as referenced in R 408.41410.
(2) An employer shall not allow an employee to enter a shaft or a tunnel heading after blasting until air quality meets minimum requirements.
(3) Blasting wire shall be kept clear of electrical lines, pipes, rails, and other conductive material, excluding earth, to prevent explosives initiation or employee exposure to electric current.
(4) After blasting operations in shafts, a competent person shall determine if the walls, ladders, timbers, blocking, or wedges have loosened. If so, necessary repairs shall be made before employees other than those assigned to make the repairs are allowed in or below the affected areas.

Notes

Mich. Admin. Code R. 408.41474
1979 AC; 2003 AACS; 2014 AACS

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.