Minn. R. agency 167, ch. 7052, ANTIDEGRADATION, pt. 7052.0310 - ANTIDEGRADATION IMPLEMENTATION
This part identifies the implementation requirements for new and expanded discharges of BSICs to OIRWs and of BCCs to high quality waters.
Actions or activities that result in a new or expanded point source discharge of a BSIC to an OIRW are prohibited unless the agency has received and approved a antidegradation demonstration that meets the requirements of part 7052.0320, subparts 2 and 3, including an identification of the best technology in process and treatment to be employed by the discharger at the facility. Subpart 4 lists the types of actions or activities that may trigger a antidegradation demonstration, and subpart 5 lists actions and activities that do not trigger a antidegradation demonstration.
On a pollutant-specific basis, actions or activities that result in a new or expanded point or nonpoint source discharge of an individual BCC to a surface water of the state in the Lake Superior Basin designated under part 7052.0300, subpart 4, as a high quality water for that BCC are prohibited unless the agency has received and approved a antidegradation demonstration that meets the requirements of part 7052.0320, subpart 2. New or expanded point source discharges of BSICs must also meet the requirements of part 7052.0320, subpart 3. This subpart only applies to dischargers for which there is a control document. Subpart 4 lists the types of actions or activities that may trigger a antidegradation demonstration, and subpart 5 lists actions and activities that do not trigger a antidegradation demonstration.
The following actions or activities require a antidegradation demonstration if they result in a new or expanded point source discharge of a BSIC to an OIRW, or a new or expanded point or nonpoint source discharge, for which there is a control document, of a BCC to a high quality water:
The actions and activities in items A to E do not require a antidegradation demonstration.
The control document regulating the discharge of any BCC, including BSICs, from point and nonpoint sources must include a requirement that the discharger notify the agency of any increased loadings of BCCs where the increase is above normal variability. The control document must also include a monitoring requirement for any BCC known or believed to be present in the discharge. Notification is not required for the exemptions in subpart 7.
Except when the agency determines on a case-by-case basis that the application of subparts 1 to 6 is required to adequately protect water quality, the procedures of this part do not apply to:
Notes
Statutory Authority: MS s 115.03; 115.44