Minn. R. agency 175, ch. 8820, EXHIBITS, FIGURES, AND TABLES, pt. 8820.9986 - MINIMUM DESIGN STANDARDS: NATURAL RESERVATION ROUTES, DESIGNATED NATIONAL FOREST HIGHWAYS WITHIN NATIONAL FORESTS, AND STATE PARK ACCESS ROADS WITHIN STATE PARKS; RECONDITIONING PROJECTS

Reconditioning projects for natural preservation routes, designated national forest highways within national forests, and state park access roads within state parks must meet or exceed the minimum dimensions indicated in the following design chart.

TYPE I, II, OR III ROUTE

Proposed Design Strength Pavement Width Shoulder-to-Shoulder Width
(tons) (feet) (feet)
7 22 (a) 26 (a)
(a) Natural preservation routes may be reconditioned to existing pavement and shoulder widths.

Widths of bridges to remain in place must equal pavement width. A bridge narrower than these widths may remain in place if the bridge does not qualify for federal-aid bridge funds. H 15 loading is required.

Notes

Minn. R. agency 175, ch. 8820, EXHIBITS, FIGURES, AND TABLES, pt. 8820.9986
20 SR 1041; 23 SR 1455; 24 SR 1885; 29 SR 449

Statutory Authority: MS s 162.02; 162.09

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.