11 Miss. Code. R. 6-5.1 - Introductory Provisions
A. Scope of
Regulations. These regulations, adopted pursuant to Section
49-17-86,
Mississippi Code of 1972, as amended, will govern the Water Pollution Control
Emergency Loan Fund (WPCELF) Program. These regulations may be superseded by
the WPCELF loan agreement when a variance or exception is made by the
Department and when not in conflict with any state or federal laws or executive
orders.
B. Definitions. The
following words and terms, when used in these regulations, will have the
following meanings, unless the context clearly indicates otherwise:
(1) Act - The Mississippi Water Pollution
Control Revolving Fund and Emergency Loan Fund Act, Sections
49-17-81
through
49-17-89,
Mississippi Code of 1972, as amended.
(2) Administration Fee - Those fees collected
from the loan recipient to defray the reasonable costs of administering the
emergency fund.
(3) Allowable Costs
- Those project costs that are eligible, reasonable, necessary, allocable to
the project, within the established project scope and budget period, in
conformance with the WPCELF Regulations, and determined allowable by the
Department.
(4) Authorized
Representative - The signatory agent or office of the applicant, authorized and
directed by the applicant's governing body to make application for assistance
and to sign documents required to undertake and complete the project on behalf
of the applicant. The signatory agent or office must be a member of, or an
employee of, the applicant's governing body and may not be under a separate
contract with the applicant at any time during the execution of the
project.
(5) Budget Period - The
time frame identified in the loan agreement as such, during which allowable
costs may be incurred.
(6) Change
Order - The documents, including supporting documentation, executed by the loan
recipient and the construction contractor, upon recommendation of the engineer
if required by the contract documents, authorizing a change, alteration, or
variance in the plans, specifications, and contract documents, including but
not limited to, additions or deletions of work to be performed pursuant to the
contract or a change in costs or time for work performed after the execution of
the contract.(7)
(7) Collector
Sewer - The common lateral sewers, within a publicly owned treatment system,
which are primarily installed to receive wastewaters directly from facilities
which convey wastewater from individual systems, or from private
property.
(8) Commission - The
Commission on Environmental Quality or its successors.
(9) Consolidation project - The acquisition
of an existing entity or its treatment works by another or the merger of two
entities.
(10) Construction - Any
one or more of the following: repair, erection, building, acquisition,
alteration, improvement or extension of water pollution control
systems.
(11) Contract - The
contracting agreement made between the loan recipient and any other party,
whether by written contract, quote, invoice, work order, or other legal
arrangement, which establishes the parties to the agreement, the scope and
price of goods or services to be provided, the timeframe for performance, and
any other provisions required by these regulations and/or state law.
(12) Contractor - The individual, company,
party or other business enterprise awarded a contract by the loan recipient to
construct any part of the project, or to supply materials, labor, equipment, or
other necessary goods or services for the project. Contractor is not the same
as Engineer, consultant, attorney, or other person or company providing
professional services in conjunction with the project
(13) Department - Mississippi Department of
Environmental Quality and staff, and their designated representatives or
successors.
(14) Eligible Applicant
- Any county, municipality, municipal public utility, district, authority,
political subdivision or other governmental unit created under state law which
has authority to dispose of domestic wastewater, industrial wastewater,
wastewater sludges resulting from the treatment of such wastewater, stormwater,
or nonpoint sources of pollution, has the authority under state law to receive
WPCELF loan assistance, has the ability to comply with these regulations and
the requirements of the WPCELF loan agreement, and which is not in arrears in
repayments to the WPCRLF, the WPCELF or the WPALP.
(15) Eligible Costs - Eligible costs are
those costs in which WPCELF loan participation is authorized pursuant to
applicable statute.
(16) Emergency
- Any circumstance caused by fire, flood, explosion, storm, earthquake,
epidemic, riot, insurrection or caused by any inherent defect due to defective
construction, or when the immediate preservation of public health or
environmental protection is necessary by reason of unforeseen event or
condition, or when the immediate restoration of a condition of usefulness or
construction of any water pollution control facilities appears advisable, or as
required by a pollution control or public health regulatory agency.
(17) Emergency Fund or Fund - The Water
Pollution Control Emergency Loan Fund, created pursuant to Section
49-17-86,
Mississippi Code of 1972, as amended.
(18) Engineer - Unless otherwise indicated,
the engineer, or engineering firm, registered by the Mississippi State Board of
Registration for Professional Engineers and Land Surveyors, retained or
employed by the loan recipient to provide professional engineering services
during the planning, design and/or construction of the project.
(19) Executive Director - The executive
director of the Department of Environmental Quality, or his designee.
(20) Financial Assistance - Loans by the
Commission, acting through the Department, from the Water Pollution Control
Emergency Loan Fund.
(21) Financial
Capability Summary - A financial analysis of a water pollution control system
to determine whether the system has the capability to reliably meet the
financial obligations on a long term basis.
(22) Improvements - Includes making necessary
repairs to existing water pollution control systems to meet the emergency and
may include new construction needed to provide a permanent correction to the
problems which caused the emergency.
(23) Infiltration - Water other than
wastewater that enters a sewer system (including sewer service connections and
foundation drains) from the ground through such means as defective pipes, pipe
joints, connections, or manholes. Infiltration does not include, and is
distinguished from, inflow.
(24)
Inflow - Water other than wastewater that enters a sewer system (including
sewer service connections) as a result of rainfall or rainfall induced soil
moisture from sources such as, but not limited to, roof leaders, cellar drains,
yard drains, area drains, drains from springs and swampy areas, manhole covers,
cross connections between storm sewers and sanitary sewers, catch basins,
cooling towers, storm waters, surface runoff, street wash waters, or drainage.
Inflow does not include, and is distinguished from, infiltration.
(25) Interceptor Sewer - A sewer which is
designed for one or more of the following purposes:
(1) To intercept wastewater from a final
point in an existing or proposed collector sewer and convey such wastes
directly to a treatment facility or another interceptor or pump
station.
(2) To replace an existing
wastewater treatment facility and transport the wastes to an adjoining
collector sewer or interceptor sewer for conveyance to a treatment
plant.
(3) To transport wastewater
from one or more municipal collector sewers to another municipality or system
or to a regional facility for treatment.
(4) To intercept an existing discharge of raw
or inadequately treated wastewater for transport directly to another
interceptor, pump station or to a treatment plant.
(26) Interlocal Agreement - An agreement or
contract between the loan applicant/recipient and other entities relating to
use, enforcement, or finances of the project or treatment works, which may be
necessary to ensure completion of a useful project.
(27) Loan Agreement - A legal and binding
agreement between the Department and the loan recipient through which the
Department provides WPCELF funds for allowable assistance and the recipient
promises to repay the principal sum and interest back to the WPCELF over a
period not to exceed 10 years at an interest rate established by the
Commission.
(28) Loan Applicant -
An eligible applicant, as defined above, that makes a WPCELF loan application
for assistance from the Department.
(29) Loan Recipient - An eligible applicant,
as defined above, that receives a WPCELF loan from the Department.
(30) May - Whenever used in the context of an
action to be taken by the loan recipient, the word "may" will be interpreted as
optional but is not mandatory.
(31)
May not - Whenever used in the context of an action by the loan recipient, such
an action is prohibited by these regulations.
(32) Must - Whenever used in the context of
an action to be taken by the loan recipient, the word "must" will be
interpreted as mandatory.
(33)
Nonpoint Source - Pollution caused by diffuse source(s) that are not regulated
as point source(s) and normally is associated with agriculture, silviculture,
urban runoff and runoff from construction activities, etc.
(34) Overflows and Bypasses - Polluted water,
such as sewage, which overflows or bypasses any portion of the treatment works
prior to complete and final treatment and discharge in accordance with the
permit.
(35) Permit - Unless
otherwise specified, the authority granted by the Mississippi Environmental
Quality Permit Board or their designated staff to discharge treated wastewater
into or adjacent to waters of the state in accordance with the stipulations of
the relevant National Pollutant Discharge Elimination System (NPDES) or State
Operating Permit.
(36) Plans,
Specifications and Contract Documents - The engineering description of the
project including engineering drawings, maps, technical specifications, design
reports and construction contract documents in sufficient detail to allow
contractors to adequately construct the work.
(37) Plans, Specifications and Contract
Documents Addendum - Any change made to the Plans, Specifications and Contract
Documents after advertisement of the documents for bidding, but prior to
opening of the bids.
(38) Plans,
Specifications and Contract Documents Revision or Amendment . Any change made
to the Plans, Specifications and Contract Documents after completion of the
initial documents, but prior to advertisement of the documents for
bidding.
(39) Point Source - Any
discernible, confined and discrete conveyance, including, but not limited to,
any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container,
concentrated animal feeding operation, vehicle, or vessel or other floating
craft from which pollutants are or may be discharged. This term does not
include agricultural stormwater discharges and return flows from irrigated
agriculture.
(40) Project - The
scope of work for which assistance is awarded under the WPCELF.
(41) Project Completion - The date of the
final construction observation, as performed by the Department, for the purpose
of an allowability determination.
(42) Protest - A written complaint to the
loan recipient concerning the loan recipient's solicitation or award of a
contract. The protest must be filed with the loan recipient by a party with a
direct financial interest adversely affected by a loan recipient's procurement
action.
(43) Record Drawings - A
final, post-construction set of reproducible design plans, revised to describe
the project as it was actually constructed, including all revisions, addenda,
change orders and field changes that affect items shown on the
drawings.
(44) Repayment -
Principal and interest repayments on WPCELF loans as established in the loan
agreement.
(45) Service line - A
conduit intended to carry wastewater, together with minor quantities of
infiltration and inflow that are not admitted intentionally, from residences,
public buildings and businesses to a collector sewer.
(46) Sewer - Any pipe, conduit, or related
appurtenance used to convey sewage or wastewater, including collectors,
interceptors, force mains and service lines.
(47) Title Counsel or Legal Counsel - The
attorney(s) of record, legally practicing, who provide(s) legal advice and
certifications relating to the project for the loan
applicant/recipient.
(48) Treatment
Works (or Water Pollution Control System) - Any devices and systems which are
used in the storage, treatment, recycling, and reclamation of waste, including
interceptor sewers, outfall sewers, sewage collection systems, pumping, power,
and other equipment and their appurtenances; extensions, improvements,
remodeling, additions, and alterations thereof; elements essential to provide a
reliable recycled supply such as standby treatment units; and any works,
including site acquisition of the land used for or in connection with the
treatment works; and any plant, disposal field, lagoon, canal, incinerator, or
other facilities installed for the purpose of treating, neutralizing or
stabilizing wastewater or nonpoint source pollution or facilities to provide
for the collection, control and disposal of wastewater or nonpoint source
pollution.
(49) Unilateral Change
Order - Change order executed only by the loan recipient, and identified as
such, in accordance with the contract documents.
(50) User Charge Ordinance - A legally
enforceable ordinance, regulation or corporate resolution enacted by the loan
recipient which includes, at least by reference, the User Charge System, and
establishes user charge rates to generate adequate revenues to cover all costs
of the treatment works, as required by the User Charge System.
(51) User Charge System - That system by
which the loan recipient charges users of the treatment works, user rates that
produce adequate revenues required for operation, maintenance, replacement of
equipment, retirement of existing debt, and repayment of the WPCELF loan for
the project.
(52) Water Pollution
Control System - see "Treatment Works."
(53) Will - Whenever used in the context of
an action to be taken by the loan recipient, the word "will" is to be
interpreted as mandatory.
(54)
WPALP - Water Pollution Abatement Loan Program
(55) WPCELF - Water Pollution Control
Emergency Loan Fund.
(56) WPCRLF -
Water Pollution Control Revolving Loan Fund.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.