11 Miss. Code. R. 7-3.6 - Inspections, Breach Analysis, and Emergency Action Plans
A. The owner and the operator of a dam shall
be responsible for the proper operation and maintenance as well as the
structural integrity of the dam. In order to fulfill this responsibility, the
owner and/or the operator should perform a visual inspection of the dam at
least every sixty (60) days and after every major rainfall event over the
watershed. Any significant deficiencies observed during such visual inspections
shall be immediately reported to MDEQ.
B. The owner or operator of a high hazard or
significant hazard dam shall have a detailed formal inspection of the dam
performed by a registered professional engineer with experience in the design
and construction of dams at such recurring intervals as may be directed by
MDEQ. In addition, annual owner's inspections of the dam submitted by the owner
may also be required. A checklist form prescribed and furnished by MDEQ shall
be used to record observations during the inspection. Inspection reports shall
be submitted to MDEQ no later than sixty (60) days after completion.
C. The owners or operators of high hazard or
significant hazard dams shall maintain records and documents related to the
original construction, recurring inspections, maintenance, repairs, and
alterations of the dam for the life of the project. Such records shall be made
available for inspection, or copies of such records furnished, upon request by
MDEQ.
D. Dam breach analysis may be
required by MDEQ to evaluate the hazard potential classification of a dam. For
hazard classification purposes, the breach analysis is typically performed as a
sunny day top of dam failure. MDEQ at its discretion may also require
additional scenarios in certain circumstances.
The breach analysis shall extend downstream of the dam to a point where the depth of flooding outside the channel is no greater than 2 feet. All breach analysis models shall be digitally submitted to MDEQ.
E. The owner or operator of a high
hazard dam shall develop an Emergency Action Plan (EAP) for the dam. MDEQ at
its discretion may also direct the owner or operator of a significant hazard
dam to develop an Emergency Action Plan (EAP). The EAP shall be submitted to
MDEQ for approval. Once approved, a copy of the EAP will be maintained on file
by MDEQ. The owner or operator of the dam shall review the EAP on an annual
basis to assure that the information contained therein is current. Revisions to
the EAP, as necessary, shall be furnished to MDEQ and all other persons
involved in the implementation of the EAP. The owner or operator also shall be
responsible for conducting or coordinating periodic training and exercises to
assure that personnel involved in the implementation of the EAP are properly
prepared to carry out their responsibilities in the event of an
emergency.
F. MDEQ employees are
authorized to make inspections at any time to evaluate the operation,
maintenance, and structural integrity of dams and reservoirs. The owner or
operator shall be required to perform, at the owner's or operator's expense,
such work as may be necessary to correct deficiencies in maintenance and
operation or accomplish necessary repairs identified by such inspections. If
deficiencies are not corrected or repairs are not made as specified in the
inspection report, the Commission may order owners or operators to take
remedial action or remove the dam in order to safeguard lives and
property.