11 Miss. Code. R. 8-1.2.11 - Permit Transfers, Revocations, Cancellations, Suspension, Rescissions and Reissuance
A. The Permit Board
may transfer, modify, revoke, cancel, rescind, suspend, or reissue a permit.
Applications for the modification, transfer or reissuance of any surface mining
permit issued under the Act and these Regulations may be filed with the
Department on forms prescribed by the Department.
B. The Permit Board may cancel a permit at
the request of the operator, if the operator does not commence operations under
the permit by stripping, grubbing or mining any part of the permit
area.
C. The Permit Board may
rescind a permit, if because of a change in post-mining use of the land by the
landowner, the completion of the approved reclamation plan by the operator is
no longer feasible. If a permit is canceled or rescinded, the remaining portion
of the bond or deposit required under the Act and these Regulations shall be
returned to the operator.
D. Any
permit issued under the Act and these Regulations shall carry with it the right
of successive reissuance upon expiration for areas within the boundaries of the
existing permit. The operator may apply for reissuance and that permit shall be
reissued, except as provided in this subsection. On application for reissuance
the burden of proving that the permit should not be reissued shall be on the
opponents of reissuance or the Department. If the opponents to reissuance or
the Department establish and the Permit Board finds, in writing, that the
operator is not satisfactorily meeting the terms and conditions of the existing
permit or the present surface mining and reclamation operation is not in
compliance with the Act and these Regulations, the Permit Board shall not
reissue the permit.
E. Any permit
reissuance shall be for a term not to exceed the term of the original permit.
Application for permit reissuance shall be filed with the Permit Board at least
sixty (60) days before the expiration of the permit. If an application for
reissuance is timely filed, the operator may continue surface mining operations
under the existing permit until the Permit Board takes action on the reissuance
application.